{"id":219509,"date":"2024-10-19T14:14:34","date_gmt":"2024-10-19T14:14:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-127162018-tc\/"},"modified":"2024-10-25T07:35:28","modified_gmt":"2024-10-25T07:35:28","slug":"bs-en-127162018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-127162018-tc\/","title":{"rendered":"BS EN 12716:2018 – TC"},"content":{"rendered":"
This document establishes general principles for the execution of jet grouting works. NOTE The jet grouting processes is distinguished from the grouting processes covered by EN 12715.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
71<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 4 Information needed for the execution of the work 4.1 General 4.2 Specific requirements <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 5 Geotechnical investigation 5.1 General 5.2 Specific Requirements <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 6 Materials and products 6.1 General 6.2 Cement 6.3 Water <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 6.4 Bentonite 6.5 Additions 6.6 Admixtures 6.7 Reinforcement 7 Considerations related to design 7.1 General <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 7.2 Geometry 7.3 Strength and Deformation Characteristics <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 7.4 Permeability 8 Execution 8.1 General <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 8.2 Equipment <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 8.3 Preparation of the site 8.4 Drilling and Tolerances <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 8.5 Jet grouting 8.6 Spoil Return 8.7 Placing the reinforcement 9 Supervision, testing and monitoring 9.1 General <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | 9.2 Preliminary tests 9.3 Supervision and process testing <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | 9.4 Testing of the jet grouted elements 9.4.1 Testing to assess geometry 9.4.2 Mechanical tests <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 9.4.3 Permeability tests 9.5 Monitoring 10 Records 10.1 Documents available on site <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 10.2 Documents to be produced on site 11 Special requirements 11.1 Compliance with national and European Standards <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 11.2 Site safety 11.3 Protection of the environment <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Annex A (informative)Determination of the material strength <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Annex B (informative)Sample Quality <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | Annex C (normative)Direct and indirect tests and quality controls <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | Annex D (informative)Examples of site records of jet grouting works <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | Annex E (informative)Degree of obligation of the provisions <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Execution of special geotechnical work. Jet grouting<\/b><\/p>\n |