{"id":601540,"date":"2024-11-05T22:10:47","date_gmt":"2024-11-05T22:10:47","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/iso-18828-22016\/"},"modified":"2024-11-05T22:10:47","modified_gmt":"2024-11-05T22:10:47","slug":"iso-18828-22016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/iso\/iso-18828-22016\/","title":{"rendered":"ISO 18828-2:2016"},"content":{"rendered":"
ISO 18828-2:2016 describes a reference planning process for seamless production planning.<\/p>\n
The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:<\/p>\n
\u00b7 general overview of the reference planning process;<\/p>\n
\u00b7 basic principles of the process model;<\/p>\n
\u00b7 description of each level identified within the reference planning process for production planning;<\/p>\n
\u00b7 structure of activities and relations within each planning discipline;<\/p>\n
\u00b7 dependencies of interdisciplinary activities.<\/p>\n
The following items are outside the scope of ISO 18828-2:2016:<\/p>\n
\u00b7 material requirement planning\/manufacturing resource planning;<\/p>\n
\u00b7 production order control;<\/p>\n
\u00b7 production process;<\/p>\n
\u00b7 early stage product design;<\/p>\n
\u00b7 order management, inventory management, purchasing, transportation, warehousing;<\/p>\n
\u00b7 production facilities planning\/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process;<\/p>\n
\u00b7 value chain (inbound logistics, operations management, outbound logistics, marketing and sales);<\/p>\n
\u00b7 resource visualization;<\/p>\n
\u00b7 process simulation.<\/p>\n","protected":false},"excerpt":{"rendered":"
Industrial automation systems and integration \u2014 Standardized procedures for production systems engineering \u2014 Part 2: Reference process for seamless production planning<\/b><\/p>\n\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n ISO<\/b><\/a><\/td>\n 2016-10<\/td>\n 40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":601553,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[385,2634],"product_tag":[],"class_list":{"0":"post-601540","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-25-040-40","7":"product_cat-iso","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/601540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/601553"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=601540"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=601540"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=601540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}