Shopping Cart

No products in the cart.

ASCE 9780784409343 2007

$71.50

Pipelines 2007

Published By Publication Date Number of Pages
ASCE 2007 1193
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This collection contains 123 papers presented at the ASCE International Conference on Pipeline Engineering and Construction, held in Boston, Massachusetts, July 8-11, 2007.

PDF Catalog

PDF Pages PDF Title
1 Cover
8 Contents
17 Planning, Design, and Construction: Renewal
Atlanta Projects
Atlanta’s Consent Decrees Drive a Substantial Commitment to Trenchless Sewer Rehabilitation
25 Atlanta’s SSES and Integrated Sewer Rehabilitation Selection Process
37 Clean Water Atlanta Enterprise GIS
45 Hydraulic Modeling – A Tool for Addressing the Consent Decree
56 Sewer Renewal
Fast-Track Pipeline Rehabilitation Using a Carbon Filter Reinforced Polymer (CFRP) Strengthening System
64 Trenchless Rehabilitation of Large Brick Conduits in Boston
75 Pipelines, Trains, and Automobiles: Rehabilitation of an 18” Sewer with No Excavation – Howard Street Sewer Project, Framingham, MA
83 Innovative Renewal Technologies
Successful Rehabilitation Project Utilizes Multiple Methods from the Trenchless Toolbox Case Study of an Infrastructure Renewal Program
91 Turn-Key Condition Assessment and Rehabilitation/Replacement Solution for an Effluent Force Main
100 PCCP Inspection: Prioritizing Risk, Assessing Shutdown Impacts, and Executing the Inspection
109 Renewal Design
Increase Your Design “Bottom Line” with Trenchless Solutions
117 Sewer Hydraulic Design Criteria
126 Validation of a Decision Support System for Method Selection in Utility Construction
136 Reliability and Quality
Steel Water Pipe – The Importance of Fabricator Certification
145 Temporary Diversion Systems: Reliability is Everything
154 Carbon Fiber Liner Quality Control for Repair of PCCP
164 Failure Analysis
Robotic RFEC/TC Inspection of Transmission Mains with Reducers: Practical Aspects
169 Sewer Pipeline Operational Condition Prediction Using Multiple Regression
180 Investigation of the Failures of the Deep Sewers and Service Laterals in California
192 Cost Analysis
Cost Comparison of Pipeline Asset Replacement: Open-Cut and Pipe-Bursting
203 Rising Water and Wastewater Pipeline Construction Costs: A Survey of the DFW Metroplex Marketplace
212 Optimal Scheduling of Pipe Replacement, Including Opportunity, Social, and Environmental Costs
223 Design Life Prediction
Study on Mechanical Property of Corroded Pipeline
232 Wastewater Collection System Rehabilitation and Replacement (R&R) Program Prioritization
237 Structural Condition Models for Sewer Pipeline
248 Renewal Investigations
Trenchless Water Pipe Condition Assessment Using Artificial Neural Network
257 Research on Safety Evaluation Model of the Main Underground Pipelines in Shanghai, China
269 102-Inch Cliff Pipe Rehabilitation
279 Planning, Design, and Construction: New Construction
Microtunneling and HDD
Twin 30-Inch Ductile Iron Pipe HDD Crossings of the Historic San Marcos River
290 Pipe Jacking in Difficult Urban Waterfront Conditions
302 Horizontal Directional Drilling with Ductile Iron Pipe
307 Innovative Record Length Twin 60-Inch Microtunnel Drives beneath US 50 and High School in West Sacramento: Combine Direct-Jacked Carrier Pipe and Casing and Carrier in Single Drive
317 Geotechnical Investigations
Procedures for Utilizing Vacuum Technology Safely and Effectively
324 Constructability of Large Diameter Pipelines in an Urban Environment: A Case Study
329 Sound Baseline Geotechnical Investigation and Interpretation Offers Most Valuable Liability Management in Pipeline Projects
343 Horizontal Directional Drilling Projects
Horizontal Directional Drilling Installation of Segmented PVC Watermain Pipe in Richmond, Canada
353 Davenport Ranch, Austin, Texas: Crossing Lake Austin Using Horizontal Directional Drilling
364 Simplified Methodology for Selecting Polyethylene Pipe for Mini (or Midi) – HDD Applications
379 Planning and Design of New Construction Projects I
Design-Build and Trenchless – A Perfect Solution!
386 HDD in an Urban Environment: The Bellevue Pump Station Force Main Project
398 Planning Methodology for Small Diameter Pipelines in an Urban Environment
408 Challenging Projects
Seymour-Capilano Water Filtration Project: Steel – The Product of Choice
422 Lake Tawakoni Water Supply Project, Critical Path Issues and Lessons Learned: Fast-Tracking a $100 Million Water Transmission Project
433 Nacimiento Water Project Intake Facility
443 Planning and Design of New Construction Projects II
Pipe Selection Criteria for Trenchless Projects: Microtunneling for Large Tunnels
458 Utilizing Trenchless Technology for Design of Utilities in Baytown
466 Water Infrastructure for the 21st Century: U.S. EPA’s Research Plans for Gravity Sewers
477 Design and Construction
HDD Utility Tunnel to Peddocks Island – Fort Andrews
487 Design and Construction of a Large Diameter Welded Steel Pipe Bridge Crossing for Potable Water Supply in Anchorage, Alaska
501 Design and Construction of Large Diameter Steel Yard Piping for a “Fast-Track” Design-Build-Operate (DBO) 100 MGD Water Treatment Plant
511 Planning and Design of New Construction Projects III
Overdeflection of 48-Inch Steel Water Line
521 Design and Construction of Denver Water’s Recycled Water Distribution System
531 Challenges for Pipeline Bidding in a Seller’s Market
542 Lessons Learned
Pipeline Planning and Design Considerations in a Challenging Urban Environment
550 How a Directional Drilled River Crossing Water Main Saved Significant Permitting Requirements, Construction Time, and Money, Aroostook River, Caribou, Maine
558 Lessons from the Failure of Two Reclaimed Water Lines in California
569 Asset Management, Risks, and Inspection
Risk Assessment
Risk Management Begins in the Planning Stage
579 Inline Assessment of Transmission Pipelines in the Oil and Gas and Water Sectors
586 Risk Management of Pipeline Corrosion in the Water and Wastewater Industries
594 Risk Management for Planning and Decision Making of Pipeline Projects
608 Pipeline Assessment
Technologies to Assess and Manage Providence Water’s 102” PCCP Aqueduct
616 Assessment of Residual Tensile Strength on Cast Iron Pipes
623 Snap, Crack, Pop – Recording of a Prestressed Pipe Failure
632 Condition Assessment and Failure Analysis
Failure of Prestressed Concrete Cylinder Pipe
649 PCCP Reliability Management
659 Welded Lap Joint Brittle Failure: A Structural Assessment of an Atlanta 72-Inch Welded Steel Water Pipe Demonstrates Need for Improvement in AWWA Standards
672 Pressure Pipe Inspection and Maintenance
PCCP Sewerage Force Main Structural Condition Assessment and Asset Management Approach
683 Condition Assessment of Prestressed Concrete Cylinder Pipe Used in the Circulating Water System at Great River Energy’s Coal Creek Station
693 Baltimore’s Pilot Water Main Inspection Program Becomes Emergency Rehab/Replacement Project
703 Asset Management I
A Proactive Approach to Asset Management: Milton’s Town-Wide Sewer Investigation and Rehabilitation Program
711 Establishing a Collection System Baseline Condition Assessment Program One Step at a Time
721 Setting Pipeline Rehabilitation Priorities to Achieve “Best” Results – A Case Study Using Condition and Criticality Criteria
731 Condition Assessment I
Condition Assessment Priorities for City of Houston
741 Establishing a CCTV Inspection, Assessment, and Improvement Program for a Large Diameter Collection System
751 Scattergraph Principles and Practice: Characterization of Sanitary Sewer and Combined Sewer Overflows
766 Asset Management II
Development of an Asset Management Framework for Culvert Inventory and Inspection
777 Making Remaining Life Predictions for Better Pipeline Asset Management
788 Using GIS for Pipeline Data Management at the Palo Verde Nuclear Facility
795 Condition Assessment II
Reconciling Conflicting Utility Location Data: A Case Study of Submarine Gas Lines in the Providence River
805 Assessing PCCP Transmission Mains
811 Condition Assessment of an Asbestos Cement Pipeline
821 Condition Assessment III
Analysis of Ductile Iron Corrosion Data from Operating Mains and Its Significance
830 LADAR-Based Pipeline Inspection and Location
841 Condition Assessment and Rehabilitation Recommendations to Renew Raw Water Pipeline Infrastructure for City of Atlanta
853 Future, Corrosion, Education, and Case Studies
New Products and Developments
The Perspective of the Small Diameter Subterrene Rock-Melting Drills Used for Trenchless Pipeline Installation
861 Practical Engineering Considerations for Developing a Free-Swimming Tool for RFEC/TC Inspection of PCCP Transmission Mains in a Live Operating Environment
867 Development of Keyhold Pipe Tapping and Plugging Tools
875 Fiber-Reinforced Composite Sandwich Technology: Expanding the Application Envelope for Cured-in-Place-Pipe Products
887 Lessons Learned
Lessons from the Investigation of the Failure of a Water Main Buried Next to 128,000 Volt Electrical Cable
900 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main into Upsized Sanitary Force Main, South San Francisco, CA
910 Lessons Learned – Lining Asbestos Cement Sewer Main
921 Corrosion Protection
Evaluation of the Corrosivity of HDD Drilling Fluids Utilized for Ductile Iron Pipe Installations
936 Cathodic Protection of an Existing Ductile Iron Water Main Using Linear Distributed Anodes
946 Corrosion Protection of Large Diameter Welded Steel Pipelines with Cement Mortar Coatings
956 Corrosion Analysis and Permitting
Assessing Polyethylene Encased Ductile Iron Pipelines
968 How to Provide Indefinite Life for Municipal Metallic Transmission Pipelines
982 Challenges of Disposing of Tunneling Water
988 New Technologies I
Pilot Tube Microtunneling Explodes in the U.S. Using Vitrified Clay Jacking Pipe
997 A New Generation of Cementitious Materials for Mortar Lining of Buried Pipes
1006 Use of Nanomaterials for Concrete Pipe Protection
1017 New Technologies II
Pneumatic Piercing Tools for Last Mile Installations
1025 A GIS Based Simulation of Ground Movement Due to Pipe Bursting Operation
1035 Innovations in Watermain Renewal
1046 Case Studies I
Pneumatic Pipe Ramming Solves Emergency Situation for Rail Corridor
1048 Case Studies for a Free-Swimming Acoustic Leak Detection System Used in Large Diameter Transmission Pipelines
1052 Lessons from the Investigation of Problems in Airport Way Sanitary Sewer in Portland, Oregon
1062 Case Studies II
Case History of Tunnel Construction, Lower Northwest Interceptor Program
1074 Integrated Leak Detection at Dallas Water Utilities
1080 Why All the Broken Pipe?
1089 Technology Evaluation
Determination of Pipe Pullback Load for Horizontal Directional Drilling (HDD) Crossings by Finite Element Method
1105 Information Pipeline: Enhancing Pipeline Management and Analysis Using GIS at the Tarrant Regional Water District
1112 Failure Risk Analysis of Lined Cylinder Pipes with Broken Wires and Corroded Cylinder
1122 Poster/Alternate Papers
Poster Presentations or Alternates
Long-Term Plastic Pipe Stiffness Measured by Conventional and Accelerated Procedures
1132 Leak Detection on Wastewater Forcemains and Siphons in North America Using the Sahara® Acoustic System
1142 Surge Protection of a Wellfield Pipeline System through Hardening and Risk Analysis
1148 A Basis for Using Single-Welded or Double-Welded Lap-Joints for Steel Water Pipe
1155 When a Train Comes – You Must Move: Transit Rail Lines Impacting Underground Infrastructure
1163 Proven Electrical Test Methods for the Evaluation of the Condition of Existing Metallic Pipelines
1173 Analysis of the Advantage of Trenchless Construction’s Cost by Disutility-Cost Assessment Method in China
1184 Research on Construction Technology for Yangtze-River Crossing Tunnel Project in Wuhan
ASCE 9780784409343 2007
$71.50