E2013-12 Standard Practice for Constructing FAST Diagrams and Performing Function Analysis During Value Analysis Study
Published By | Publication Date | Number of Pages |
ASTM | 2012 | 16 |
1.1 This practice covers a logical structure for the function analysis of a building project or process.
1.2 This practice provides a system to identify unnecessary costs of a project.
1.3 The values stated in SI units are to be regarded as standard. The values given in parentheses are mathematical conversions to inch-pound units that are provided for information only and are not considered standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Scope Referenced Documents Terminology Summary of Practice Significance and Use Procedure |
2 | FIG. 1 |
3 | FIG. 2 |
5 | Report Keywords X1. TECHNICAL FAST CASE STUDY X1.1 X1.2 X1.3 TABLE 1 TABLE 2 FIG. X1.1 |
6 | X1.4 X1.5 X1.6 X1.7 X1.8 X1.9 X1.10 X1.11 X1.12 X1.13 X1.14 X1.15 FIG. X1.2 FIG. X1.3 |
7 | X1.16 FIG. X1.4 |
8 | FIG. X1.5 |
9 | FIG. X1.6 |
10 | FIG. X1.7 FIG. X1.8 FIG. X1.9 |
11 | X2. TASK-ORIENTED FAST CASE STUDY X2.1 X2.2 X2.3 X2.4 FIG. X1.10 |
12 | X2.5 X2.6 X2.7 X2.8 X2.9 X2.10 X2.11 FIG. X2.1 |
13 | FIG. X2.2 TABLE X2.1 |
14 | FIG. X2.3 TABLE X2.2 |
15 | FIG. X2.4 |