Shopping Cart

No products in the cart.

BS 5607:2017 – TC:2020 Edition

$280.87

Tracked Changes. Code of practice for the safe use of explosives in the construction industry

Published By Publication Date Number of Pages
BSI 2020 206
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
124 Foreword
127 Section 1: Preliminary processes
1 Scope
2 Normative references
128 3 Terms and definitions
133 4 Preliminary procedures
4.1 General
4.2 Legal framework
5 Role of the client
134 5.1 General
5.2 Demolition works
136 6 Risk assessment and site survey
6.1 Risk assessment
137 6.2 Site survey
138 6.3 Hazards from electrical sources
6.4 Exclusion zone and warning procedures
6.5 Sources of ignition and fire
6.6 Advance notices and consultation
139 7 Method statement
7.1 General
7.2 Preparation
140 7.3 Implementation of the method statement
141 7.4 Exclusion zone and warning procedures/systems
142 8 Supervision and responsibility
144 9 Safety and security of explosives during acquisition, transport and storage on site
9.1 General
9.2 Planning
145 9.3 Storage
148 9.4 Transport of explosives on site
149 9.5 Transport of explosives by air
9.6 Disposal of unwanted explosives or explosives which have deteriorated during storage
150 10 Safety when using explosives
10.1 General
10.2 Handling and charging of explosives
151 10.3 Types of explosives
153 10.4 Initiation systems
156 10.5 Misfires
157 Figure 1 — Procedure to remedy misfires
162 Section 2: Blasting operations
11 Tunnelling and shaft sinking
11.1 General
11.2 Method statement
11.3 Site survey
163 11.4 Containment measures
11.5 Explosives
164 Figure 2 — Exclusion zones for shaft sinking and tunnelling
166 11.6 Safety and operations
172 12 Demolition
173 12.1 General
12.2 Quality assurance and auditing of the works
12.3 Pre-weakening
12.4 Site survey/risk assessment
174 12.5 Blast design
175 12.6 Independent audit of the blasting method statement and its implementation
12.7 Method statement
179 12.8 Explosives
180 12.9 Safety and operations
181 12.10 Misfires
12.11 Debris and site clearance
13 Underwater blasting
182 13.1 General
13.2 Method statement
13.3 Site survey
183 13.4 Exclusion zones and blast warning procedures
Figure 3 — Relationship of blast area and exclusion zones in underwater blasting
Table 1 — Recommended minimum distances from underwater blasting operations
184 13.5 Explosives
186 13.6 Safety and operations
188 13.7 Misfires
13.8 Seismic impulse generation
14 Land excavation
14.1 General
189 14.2 Documentation
14.3 Risk assessment and site survey
190 14.4 Method statements
191 14.5 Drilling
14.6 Exclusion zones and blast protection
192 Figure 4 — Exclusion zone for land excavation
193 14.7 Transport and storage
14.8 Explosives and initiation systems
Table 2 — Selection and use of explosives
194 Table 3 — Selection and use of initiation systems
14.9 Safety and operations
195 15 Other forms of blasting
15.1 Mini-blasting
196 15.2 Deflagrating compounds (low-velocity explosives)
15.3 Cardox
15.4 Expanding grouts
197 Annex A (normative)  Competence for blasting operations
198 Annex B (informative)  Qualifications for blasting
199 Table B.1 — Blasting operations competency units
Annex C (informative)  Explosives engineering training
200 Annex D (informative)  General properties of explosives
201 Bibliography
BS 5607:2017 - TC
$280.87