BS EN 16603-10-03:2022
$215.11
Space engineering. Testing
Published By | Publication Date | Number of Pages |
BSI | 2022 | 136 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
11 | 1 Scope |
13 | 2 Normative references |
14 | 3 Terms, definitions and abbreviated terms 3.1 Terms from other standards |
15 | 3.2 Terms specific to the present standard |
21 | 3.3 Abbreviated terms |
24 | 3.4 Nomenclature |
25 | 4 General requirements 4.1 Test programme 4.2 Development test prior qualification |
26 | 4.3 Test management 4.3.1 General 4.3.2 Test reviews 4.3.2.1 Test programme |
27 | 4.3.2.2 Test readiness review (TRR) |
28 | 4.3.2.3 Post test review (PTR) |
29 | 4.3.2.4 Test review board (TRB) |
30 | 4.3.3 Test documentation 4.3.3.1 General 4.3.3.2 Assembly, integration and test plan (AIT Plan) 4.3.3.3 Test specification (TSPE) 4.3.3.4 Test procedure (TPRO) |
31 | 4.3.3.5 Test report (TRPT) 4.3.4 Anomaly or failure during testing 4.3.5 Test data 4.4 Test conditions, input tolerances, and measurement uncertainties 4.4.1 Test conditions |
32 | 4.4.2 Test input tolerances |
34 | 4.4.3 Measurement uncertainties |
36 | 4.5 Test objectives 4.5.1 General requirements 4.5.2 Qualification testing |
37 | 4.5.3 Acceptance testing 4.5.4 Protoflight testing 4.5.4.1 Overview 4.5.4.2 Requirements |
38 | 4.6 Retesting 4.6.1 Overview 4.6.2 Implementation of a design modification after completion of qualification 4.6.3 Storage after protoflight or acceptance testing |
39 | 4.6.4 Space segment element or equipment to be re-flown |
40 | 4.6.5 Flight use of qualification Space segment element or equipment |
41 | 5 Space segment equipment test requirements 5.1 General requirements |
44 | 5.2 Qualification tests requirements |
53 | 5.3 Acceptance test requirements |
60 | 5.4 Protoflight test requirements |
68 | 5.5 Space segment equipment test programme implementation requirements 5.5.1 General tests 5.5.1.1 Functional and performance tests |
69 | 5.5.1.2 Humidity test |
70 | 5.5.1.3 Life test |
71 | 5.5.1.4 Burn-in test 5.5.2 Mechanical tests 5.5.2.1 Physical properties measurements |
72 | 5.5.2.2 Acceleration test (static, spin or sine burst) 5.5.2.3 Random vibration test 5.5.2.4 Acoustic test |
73 | 5.5.2.5 Sinusoidal vibration test 5.5.2.6 Shock test |
74 | 5.5.2.7 Micro-vibration generated environment test 5.5.2.8 Micro-vibration susceptibility test |
75 | 5.5.3 Structural integrity under pressure tests 5.5.3.1 Leak test |
76 | 5.5.3.2 Proof pressure test 5.5.3.3 Pressure cycling test 5.5.3.4 Design burst pressure test 5.5.3.5 Burst test 5.5.4 Thermal tests 5.5.4.1 Requirements applicable to thermal vacuum test and thermal test at mission pressure |
78 | 5.5.4.2 Requirements applicable to thermal vacuum test 5.5.4.3 Requirements applicable to thermal test at mission pressure |
79 | 5.5.5 Electrical/RF tests 5.5.5.1 EMC test 5.5.5.2 Magnetic test 5.5.5.3 ESD test 5.5.5.4 Passive intermodulation test |
80 | 5.5.5.5 Multipactor test 5.5.5.6 Corona and arc discharge test 5.5.6 Mission specific test 5.5.6.1 Audible noise test |
81 | 6 Space segment element test requirements 6.1 General requirements 6.2 Qualification test requirements |
89 | 6.3 Acceptance test requirements |
96 | 6.4 Protoflight test requirements |
103 | 6.5 Space segment elements test programme implementation requirements 6.5.1 General tests 6.5.1.1 Optical alignment measurement 6.5.1.2 Functional tests |
105 | 6.5.1.3 Performance test 6.5.1.4 Mission test |
106 | 6.5.1.5 Polarity test |
107 | 6.5.1.6 Launcher interface test 6.5.2 Mechanical tests 6.5.2.1 Physical properties measurements |
108 | 6.5.2.2 Modal survey test 6.5.2.3 Static load test 6.5.2.4 Spin test 6.5.2.5 Transient and Sine Burst Tests |
109 | 6.5.2.6 Acoustic test |
110 | 6.5.2.7 Random vibration test 6.5.2.8 Sinusoidal vibration test |
111 | 6.5.2.9 Shock test |
112 | 6.5.2.10 Micro-vibration susceptibility test |
113 | 6.5.2.11 Micro-vibration emission test 6.5.3 Structural integrity under pressure tests 6.5.3.1 Proof pressure test 6.5.3.2 Pressure cycling test 6.5.3.3 Design burst pressure test |
114 | 6.5.3.4 Leak test 6.5.4 Thermal tests 6.5.4.1 Requirements applicable to thermal vacuum test and thermal tests at mission pressure |
115 | 6.5.4.2 Requirements applicable to thermal vacuum test 6.5.4.3 Requirements applicable to thermal test at mission pressure |
116 | 6.5.4.4 Thermal balance test 6.5.5 Electromagnetic tests 6.5.5.1 General 6.5.5.2 Electromagnetic compatibility test 6.5.5.3 Electromagnetic auto-compatibility test |
117 | 6.5.5.4 Passive intermodulation test 6.5.5.5 Magnetic field measurements 6.5.6 Mission specific tests 6.5.6.1 Aero-thermodynamic test 6.5.7 Crewed mission specific tests 6.5.7.1 Vibroacoustic emission test |
118 | 6.5.7.2 Human factor engineering (HFE) test 6.5.7.3 Toxic off gassing test 6.5.7.4 Audible noise test |
119 | 7 Pre-launch testing |