Tracked Changes. Road vehicles. Standardized access to automotive repair and maintenance information (RMI) – Conformance test

Published By Publication Date Number of Pages
BSI 2021 194
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document specifies a conformance test for a vehicle manufacturer assessment of self-conformance of the VM RMI system. The conformance test cases follow the use case definition of ISO 18541-1 and the requirements stated in ISO 18541-2 and ISO 18541-3 .

The primary, but not exclusive, purpose of this document is to provide information to the VM RMI system provider to build and test the VM RMI system against the conformance test cases. This final step in the development process of the VM RMI system is an enabler for all providers that their VM RMI system meets a high degree of functional requirements expected by the end user.

Furthermore, this document defines in Annex A conformance test cases for the use cases and requirements versions that apply for granting access to security-related RMI following the SERMI scheme.

This document is applicable to light passenger and commercial vehicles as defined in regulation (EC) 715/2007 Article 2 [ 9 ].

PDF Catalog

PDF Pages PDF Title
104 National foreword
106 European foreword
117 Foreword
118 Introduction
119 1 Scope
2 Normative references
3 Terms and definitions
120 4 Abbreviated terms
5 Conformance test basic principles and clustering
5.1 Basic principles for conformance test case definition
121 5.2 Conformance test clustering
5.2.1 General
5.2.2 Main conformance test case clusters
125 6 Test case structure
6.1 Conformance test case — General structure
6.1.1 Overview
126 6.1.2 Test case reference number and title [RMI-CT_…] [title]
6.1.3 Test purpose
6.1.4 Configuration
6.1.5 Preamble (setup state)
6.1.6 Test execution
6.1.7 Post-amble
6.2 Result criteria
127 7 CT cluster 1 — Test technical infrastructure
7.1 [RMI-CT_TREQ-13, 14, 15, 16, 18, Annex A] Test client configuration
7.1.1 Overview
7.1.2 Test purpose
7.1.3 Configuration
7.1.4 Preamble (setup state)
7.1.5 Test execution
128 7.1.6 Post-amble
7.2 [RMI-CT_TREQ-17] Test presentation formats for information packages
7.2.1 Overview
7.2.2 Test purpose
7.2.3 Configuration
7.2.4 Preamble (setup state)
7.2.5 Test execution
7.2.6 Post-amble
8 CT cluster 2 — Test client’s external interfaces
8.1 [RMI-CT_TREQ-9] Test vehicle communication interface (VCI)
8.1.1 Overview
8.1.2 Test purpose
129 8.1.3 Configuration
8.1.4 Preamble (setup state)
8.1.5 Test execution
8.1.6 Post-amble
8.2 [RMI-CT_TREQ-11] Test parts ordering for security-related features
8.2.1 Overview
8.2.2 Test purpose
130 8.2.3 Configuration
8.2.4 Preamble (setup state)
8.2.5 Test execution
8.2.6 Post-amble
8.3 [RMI-CT_TREQ-12] Test partnered accessory provider systems
8.3.1 Overview
8.3.2 Test purpose
8.3.3 Configuration
8.3.4 Preamble (setup state)
131 8.3.5 Test execution
8.3.6 Post-amble
9 CT cluster 3 — Test user authentication, authorization and administration
9.1 [RMI-CT_UC1.1] Test to register IO for use of the VM RMI system
9.1.1 Overview
9.1.2 Test purpose
9.1.3 Configuration
9.1.4 Preamble (setup state)
132 9.1.5 Test execution
9.1.6 Post-amble
9.2 [RMI-CT_UC1.2_A] Test to register IO employee for use of the VM RMI system — Scenario A
9.2.1 Overview
9.2.2 Test purpose
9.2.3 Configuration
9.2.4 Preamble (setup state)
133 9.2.5 Test execution
9.3 [RMI-CT_UC1.2_B] Test to register IO employee for use of the VM RMI system — Scenario B
9.3.1 Overview
9.3.2 Test purpose
9.3.3 Configuration
9.3.4 Preamble (setup state)
134 9.3.5 Test execution
9.3.6 Post-amble
9.4 [RMI-CT_UC1.3] Test to maintain IO status
9.4.1 Overview
9.4.2 Test purpose
9.4.3 Configuration
9.4.4 Preamble (setup state)
135 9.4.5 Test execution
9.4.6 Post-amble
9.5 [RMI-CT_UC1.4] Test to maintain user status
9.5.1 Overview
9.5.2 Test purpose
9.5.3 Configuration
9.5.4 Preamble (setup state)
9.5.5 Test execution
136 9.5.6 Post-amble
9.6 [RMI-CT_UC1.5] Test to the deletion of the registration of an IO employee
9.6.1 Overview
9.6.2 Test purpose
9.6.3 Configuration
9.6.4 Preamble (setup state)
9.6.5 Test execution
137 9.6.6 Post-amble
9.7 [RMI-CT_UC1.6] Test login to VM RMI system
9.7.1 Overview
9.7.2 Test purpose
9.7.3 Configuration
9.7.4 Preamble (setup state)
9.7.5 Test execution
9.7.6 Post-amble
9.8 [RMI-CT_UC1.7] Test for granting access to security-related RMI
9.8.1 Overview
138 9.8.2 Test purpose
9.8.3 Configuration
9.8.4 Preamble (setup state)
9.8.5 Test execution
9.8.6 Post-amble
10 CT cluster 4 — Test functional user interface implementation
10.1 [RMI-CT_FREQ-1] Test for RMI access mode
10.1.1 Overview
10.1.2 Test purpose
10.1.3 Configuration
139 10.1.4 Preamble (setup state)
10.1.5 Test execution
10.1.6 Post-amble
10.2 [RMI-CT_FREQ-2] Test for registration and login support
10.2.1 Overview
10.2.2 Test purpose
10.2.3 Configuration
10.2.4 Preamble (setup state)
10.2.5 Test execution
140 10.2.6 Post-amble
10.2.7 Result criteria
10.3 [RMI-CT_FREQ-3] Test for implemented use cases map
10.3.1 Overview
10.3.2 Test purpose
10.3.3 Configuration
10.3.4 Preamble (setup state)
10.3.5 Test execution
10.3.6 Post-amble
141 10.4 [RMI-CT_FREQ-4] Test for download area
10.4.1 Overview
10.4.2 Test purpose
10.4.3 Configuration
10.4.4 Preamble (setup state)
10.4.5 Test execution
10.4.6 Post-amble
10.5 [RMI-CT_FREQ-5] Test for navigational pathway
10.5.1 Overview
142 10.5.2 Test purpose
10.5.3 Configuration
10.5.4 Preamble (setup state)
10.5.5 Test execution
10.5.6 Post-amble
11 CT cluster 5 — Test payment for RMI
11.1 [RMI-CT_UC2] Test payment for RMI
11.1.1 Overview
143 11.1.2 Test purpose
11.1.3 Configuration
11.1.4 Preamble (setup state)
11.1.5 Test execution
11.1.6 Post-amble
144 12 CT cluster 6 —Test for vehicle identification
12.1 [RMI-CT_UC3.1] Test vehicle identification through use of VIN
12.1.1 Overview
12.1.2 Test purpose
12.1.3 Configuration
12.1.4 Preamble (setup state)
12.1.5 Test execution
12.1.6 Post-amble
145 12.2 [RMI-CT_UC3.2] Test vehicle identification via product features
12.2.1 Overview
12.2.2 Test purpose
12.2.3 Configuration
12.2.4 Preamble (setup state)
12.2.5 Test execution
12.2.6 Post-amble
146 13 CT cluster 7 — Test selection methods for RMI
13.1 [RMI-CT_UC4.1] Test selection of information type
13.1.1 Overview
13.1.2 Test purpose
13.1.3 Configuration
13.1.4 Preamble (setup state)
13.1.5 Test execution
13.1.6 Post-amble
13.2 [RMI-CT_UC4.2] Test search by standardized terms
13.2.1 Overview
147 13.2.2 Test purpose
13.2.3 Configuration
13.2.4 Preamble (setup state)
13.2.5 Test execution
13.2.6 Post-amble
13.3 [RMI-CT_UC4.3] Test navigation using product structure
13.3.1 Overview
13.3.2 Test purpose
148 13.3.3 Configuration
13.3.4 Preamble (setup state)
13.3.5 Test execution
13.3.6 Post-amble
13.4 [RMI-CT_UC4.4] Test selection by document identifier
13.4.1 Overview
13.4.2 Test purpose
13.4.3 Configuration
13.4.4 Preamble (setup state)
149 13.4.5 Test execution
13.4.6 Post-amble
14 CT cluster 8 — Test retrieval of information packages
14.1 [RMI-CT_UC5.1.1] Test retrieval of general workshop procedures
14.1.1 Overview
14.1.2 Test purpose
14.1.3 Configuration
14.1.4 Preamble (setup state)
150 14.1.5 Test execution
14.1.6 Post-amble
14.2 [RMI-CT_UC5.1.2] Test retrieval of body repair procedures
14.2.1 Overview
14.2.2 Test purpose
14.2.3 Configuration
14.2.4 Preamble (setup state)
14.2.5 Test execution
151 14.2.6 Post-amble
14.3 [RMI-CT_UC5.1.3] Test retrieval of temporary repair procedures
14.3.1 Overview
14.3.2 Test purpose
14.3.3 Configuration
14.3.4 Preamble (setup state)
14.3.5 Test execution
152 14.3.6 Post-amble
14.4 [RMI-CT_UC5.1.4] Test retrieval of preparation for PTI
14.4.1 Overview
14.4.2 Test purpose
14.4.3 Configuration
14.4.4 Preamble (setup state)
14.4.5 Test execution
153 14.4.6 Post-amble
14.5 [RMI-CT_UC5.2] Test retrieval of wiring diagrams
14.5.1 Overview
14.5.2 Test purpose
14.5.3 Configuration
14.5.4 Preamble (setup state)
14.5.5 Test execution
14.5.6 Post-amble
14.6 [RMI-CT_UC5.3] Test retrieval of technical service bulletin
14.6.1 Overview
154 14.6.2 Test purpose
14.6.3 Configuration
14.6.4 Preamble (setup state)
14.6.5 Test execution
14.6.6 Post-amble
14.7 [RMI-CT_UC5.4] Test retrieval of recall information
14.7.1 Overview
14.7.2 Test purpose
14.7.3 Configuration
155 14.7.4 Preamble (setup state)
14.7.5 Test execution
14.7.6 Post-amble
14.8 [RMI-CT_UC5.5] Test retrieval of maintenance schedule
14.8.1 Overview
14.8.2 Test purpose
14.8.3 Configuration
14.8.4 Preamble (setup state)
156 14.8.5 Test execution
14.8.6 Post-amble
14.9 [RMI-CT_UC5.6.1] Test retrieval of spare parts (identification)
14.9.1 Overview
14.9.2 Test purpose
14.9.3 Configuration
14.9.4 Preamble (setup state)
14.9.5 Test execution
157 14.9.6 Post-amble
14.10 [RMI-CT_UC5.6.2] Test retrieval of spare parts (access)
14.10.1 Overview
14.10.2 Test purpose
14.10.3 Configuration
14.10.4 Preamble (setup state)
14.10.5 Test execution
158 14.10.6 Post-amble
14.11 [RMI-CT_UC5.7.1] Test retrieval of accessory information factory fitted (included in general RMI)
14.11.1 Overview
14.11.2 Test purpose
14.11.3 Configuration
14.11.4 Preamble (setup state)
14.11.5 Test execution
14.11.6 Post-amble
159 14.12 [RMI-CT_UC5.7.2] Test retrieval of accessory information partnered with a VM part number
14.12.1 Overview
14.12.2 Test purpose
14.12.3 Configuration
14.12.4 Preamble (setup state)
14.12.5 Test execution
14.12.6 Post-amble
14.13 [RMI-CT_UC5.7.3] Test retrieval of fitting information for accessories with no VM part number
14.13.1 Overview
160 14.13.2 Test purpose
14.13.3 Configuration
14.13.4 Preamble (setup state)
14.13.5 Test execution
14.13.6 Post-amble
14.14 [RMI-CT_UC5.8] Test retrieval of labour times
14.14.1 Overview
14.14.2 Test purpose
161 14.14.3 Configuration
14.14.4 Preamble (setup state)
14.14.5 Test execution
14.14.6 Post-amble
14.15 [RMI-CT_UC5.9] Test retrieval of converted vehicle information
14.15.1 Overview
14.15.2 Test purpose
14.15.3 Configuration
14.15.4 Preamble (setup state)
162 14.15.5 Test execution
14.15.6 Post-amble
14.16 [RMI-CT_UC5.10] Test retrieval of special tool information
14.16.1 Overview
14.16.2 Test purpose
14.16.3 Configuration
14.16.4 Preamble (setup state)
163 14.16.5 Test execution
14.16.6 Post-amble
15 CT cluster 9 — Test vehicle diagnostics
15.1 [RMI-CT_UC6.1] Test DTC resolution
15.1.1 Overview
15.1.2 Test purpose
15.1.3 Configuration
15.1.4 Preamble (setup state)
15.1.5 Test execution
164 15.1.6 Post-amble
15.2 [RMI-CT_UC6.2] Test VM symptom resolution
15.2.1 Overview
15.2.2 Test purpose
15.2.3 Configuration
15.2.4 Preamble (setup state)
15.2.5 Test execution
165 15.2.6 Post-amble
15.3 [RMI-CT_UC6.3] Test integrated diagnostics
15.3.1 Overview
15.3.2 Test purpose
15.3.3 Configuration
15.3.4 Preamble (setup state)
15.3.5 Test execution
166 15.3.6 Post-amble
16 CT cluster 10 — Test updating, replacing and tuning of modules (ECUs)
16.1 [RMI-CT_UC7.1] Test updating and replacing modules information
16.1.1 Overview
16.1.2 Test purpose
16.1.3 Configuration
16.1.4 Preamble (setup state)
16.1.5 Test execution
167 16.1.6 Post-amble
16.2 [RMI-CT_UC7.2] Test tuning kit
16.2.1 Overview
16.2.2 Test purpose
16.2.3 Configuration
16.2.4 Preamble (setup state)
16.2.5 Test execution
168 16.2.6 Post-amble
17 CT cluster 11 — Test electronic maintenance history
17.1 [RMI-CT_UC8] Test electronic maintenance history
17.1.1 Overview
17.1.2 Test purpose
17.1.3 Configuration
17.1.4 Preamble (setup state)
17.1.5 Test execution
169 17.1.6 Post-amble
18 CT cluster 12 — Test repair assistance, technical support
18.1 [RMI-CT_UC9] Test repair assistance technical support
18.1.1 Overview
18.1.2 Test purpose
18.1.3 Configuration
18.1.4 Preamble (setup state)
18.1.5 Test execution
170 18.1.6 Post-amble
19 CT cluster 13 — Test request for contact information
19.1 [RMI-CT_UC10.1] Test for retrieval of electronic tool information (diagnostic, reprogramming, VCI)
19.1.1 Overview
19.1.2 Test purpose
19.1.3 Configuration
19.1.4 Preamble (setup state)
19.1.5 Test execution
19.1.6 Post-amble
171 19.2 [RMI-CT_UC10.2] Test for retrieval of test equipment and diagnostic tool manufacturers information
19.2.1 Overview
19.2.2 Test purpose
19.2.3 Configuration
19.2.4 Preamble (setup state)
19.2.5 Test execution
19.2.6 Post-amble
19.3 [RMI-CT_UC10.3] Test for retrieval of training material (delegate information)
19.3.1 Overview
19.3.2 Test purpose
172 19.3.3 Configuration
19.3.4 Preamble (setup state)
19.3.5 Test execution
19.3.6 Post-amble
19.4 [RMI-CT_UC10.4] Test for retrieval of redistributor contact information
19.4.1 Overview
19.4.2 Test purpose
19.4.3 Configuration
19.4.4 Preamble (setup state)
173 19.4.5 Test execution
19.4.6 Post-amble
19.5 [RMI-CT_UC10.5] Test for retrieval of republisher information
19.5.1 Overview
19.5.2 Test purpose
19.5.3 Configuration
19.5.4 Preamble (setup state)
19.5.5 Test execution
174 19.5.6 Post-amble
19.6 [RMI-CT_UC10.6] Test for retrieval of inspection and testing services information
19.6.1 Overview
19.6.2 Test purpose
19.6.3 Configuration
19.6.4 Preamble (setup state)
19.6.5 Test execution
19.6.6 Post-amble
175 19.7 [RMI-CT_UC10.7] Test for retrieval of alternative fuels retrofit system information
19.7.1 Overview
19.7.2 Test purpose
19.7.3 Configuration
19.7.4 Preamble (setup state)
19.7.5 Test execution
19.7.6 Post-amble
19.8 [RMI-CT_UC10.8] Test for retrieval of engine and components remanufacturing information
19.8.1 Overview
176 19.8.2 Test purpose
19.8.3 Configuration
19.8.4 Preamble (setup state)
19.8.5 Test execution
19.8.6 Post-amble
19.9 [RMI-CT_UC10.9] Test for retrieval of component and parts manufacturer information
19.9.1 Overview
19.9.2 Test purpose
19.9.3 Configuration
177 19.9.4 Preamble (setup state)
19.9.5 Test execution
19.9.6 Post-amble
19.10 [RMI-CT_UC10.10] Test for retrieval of validation of independently developed non-proprietary VCI information
19.10.1 Overview
19.10.2 Test purpose
19.10.3 Configuration
19.10.4 Preamble (setup state)
178 19.10.5 Test execution
19.10.6 Post-amble
20 CT cluster 14 — Test courses and training information
20.1 [RMI-CT_UC11] Test for courses and training information
20.1.1 Overview
20.1.2 Test purpose
20.1.3 Configuration
20.1.4 Preamble (setup state)
20.1.5 Test execution
179 20.1.6 Post-amble
21 CT cluster 15 — Test data administration requirements
21.1 [RMI-CT_TREQ-1] Test general access-related data administration
21.1.1 Overview
21.1.2 Test purpose
21.1.3 Configuration
21.1.4 Preamble (setup state)
21.1.5 Test execution
21.1.6 Post-amble
180 21.2 [RMI-CT_TREQ-2] Test administration of IO data by the VM
21.2.1 Overview
21.2.2 Test purpose
21.2.3 Configuration
21.2.4 Preamble (setup state)
21.2.5 Test execution
21.2.6 Post-amble
21.3 [RMI-CT_TREQ-3] Test administration of IO employee data by the VM
21.3.1 Overview
21.3.2 Test purpose
21.3.3 Configuration
21.3.4 Preamble (setup state)
21.3.5 Test execution
181 21.3.6 Post-amble
21.4 [RMI-CT_TREQ-4] Test administration of invoicing data by VM
21.4.1 Overview
21.4.2 Test purpose
21.4.3 Configuration
21.4.4 Preamble (setup state)
21.4.5 Test execution
21.4.6 Post-amble
21.5 [RMI-CT_TREQ-5] Test administration of access event data by VM
21.5.1 Overview
21.5.2 Test purpose
21.5.3 Configuration
182 21.5.4 Preamble (setup state)
21.5.5 Test execution
21.5.6 Post-amble
21.6 [RMI-CT_TREQ-6] Test administration of access event data to security-related RMI by VM
21.6.1 Overview
21.6.2 Test purpose
21.6.3 Configuration
21.6.4 Preamble (setup state)
21.6.5 Test execution
21.6.6 Post-amble
183 22 CT cluster 16 — Test VM software installation on the IO client
22.1 [RMI-CT_TREQ-20] Test for requirements for installing VM-specific software on the IO client
22.1.1 Overview
22.1.2 Test purpose
22.1.3 Configuration
22.1.4 Preamble (setup state)
22.1.5 Test execution
22.1.6 Post-amble
22.2 [RMI-CT_TREQ-21] Test for requirements for updating of installed VM data and applications on the IO client
22.2.1 Overview
184 22.2.2 Test purpose
22.2.3 Configuration
22.2.4 Preamble (setup state)
22.2.5 Test execution
22.2.6 Post-amble
22.3 [RMI-CT_TREQ-22] Test for requirements for the operation of VM-specific software on the IO client
22.3.1 Overview
22.3.2 Test purpose
185 22.3.3 Configuration
22.3.4 Preamble (setup state)
22.3.5 Test execution
22.3.6 Post-amble
22.4 [RMI-CT_TREQ-23] Test for requirements for the uninstalling of VM-specific software on the IO client
22.4.1 Overview
22.4.2 Test purpose
22.4.3 Configuration
22.4.4 Preamble (setup state)
186 22.4.5 Test execution
22.4.6 Post-amble
22.5 [RMI-CT_TREQ-24] Test for requirements for restoring in case of an abnormal termination of the VM specific software on the IO client
22.5.1 Overview
22.5.2 Test purpose
22.5.3 Configuration
22.5.4 Preamble (setup state)
22.5.5 Test execution
187 22.5.6 Post-amble
23 CT cluster 17 — Test VM RMI operations
23.1 [RMI-CT_TREQ-25] Test for VM RMI system availability time
23.1.1 Overview
23.1.2 Test purpose
23.1.3 Configuration
23.1.4 Preamble (setup state)
23.1.5 Test execution
23.1.6 Post-amble
188 23.2 [RMI-CT_TREQ-26] Test for support for the usage of the VM RMI system
23.2.1 Overview
23.2.2 Test purpose
23.2.3 Configuration
23.2.4 Preamble (setup state)
23.2.5 Test execution
23.2.6 Post-amble
24 CT cluster 18 — Test trust centre (certificate management)
24.1 [RMI-CT_TREQ-10] Test for trust centre (certificate management)
189 Annex A (normative) Access to security-related RMI according to SERMI scheme
193 Bibliography
BS EN ISO 18541-4:2021 - TC
$280.87