BS EN ISO/ASTM 52920:2023
$189.07
Additive manufacturing. Qualification principles. Requirements for industrial additive manufacturing processes and production sites
Published By | Publication Date | Number of Pages |
BSI | 2023 | 48 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
11 | 5.1 Environmental, health and safety (EHS) 5.2 Waste disposal 5.3 AM system installation |
12 | 5.4 Ancillary equipment 5.5 Feedstock storage 5.6 IT infrastructure 5.7 Foreign object debris (FOD) 5.8 Provision of the process resources |
13 | 5.9 Manufacturing management system 5.10 Maintenance/calibration system 6.1 General 6.2 Design assessment and review |
14 | 6.3 Manufacturing assessment and review 6.3.1 Additive manufacturing process 6.3.2 Process finalization 6.3.3 Post processing 7.1 General |
15 | 7.2 Scope of qualification 7.3 Validation planning 7.3.1 Process mapping 7.3.2 Risk assessment |
16 | 7.3.3 Master validation plan 7.4 Qualification [installation, operation, and performance (IQ/OQ/PQ)] |
17 | 7.5 Manufacturing plan specification |
18 | 7.6 Documentation and tracing of the process steps 7.6.1 General 7.6.2 Manufacturing plan 7.6.3 IQ documents |
19 | 7.6.4 OQ/PQ documents for the complete process 7.7 Relevant process steps within the additive system operations 7.7.1 Overview of additive system operations 7.7.2 Requirements for pre-process: data preparation |
21 | 7.7.3 Requirements for feedstock management |
23 | 7.7.4 Requirements for pre-process: system set-up |
24 | 7.7.5 Requirements for additive manufacturing: build cycle |
25 | 7.7.6 Requirements for AM-process: process finalization |
27 | 8.1 General 8.2 Personnel requirements |
28 | 8.3 Non-conformities 8.3.1 General 8.3.2 Acceptance criteria 8.3.3 Handling of non-conformities |
29 | 8.4 Continuous improvement process 8.5 Quality controls 8.5.1 General |
30 | 8.5.2 Production run approval |
31 | 8.5.3 Part approval |