Shopping Cart

No products in the cart.

BS ISO 22472:2016 – TC:2020 Edition

$258.95

Tracked Changes. Ships and marine technology. Guidelines for the operation and installation of voyage data recorder (VDR)

Published By Publication Date Number of Pages
BSI 2020 166
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
1 compares BS ISO 22472:2016
2 TRACKED CHANGES
Text example 1 — indicates added text (in green)
112 National foreword
117 Foreword
119 1 Scope
2 Normative references
120 3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
122 3.2 Abbreviated terms
4 VDR interface
4.1 General
4.2 Input signals required for VDR interfaces
4.2.1 Signals defined in applicable parts of IEC 61162 series
123 4.2.2 Signals other than IEC 61162 format
124 4.2.3 Bridge audible sound captured by microphones
4.2.4 VHF radio connection
4.2.5 Radar display connection
4.2.6 ECDIS display connection
125 4.3 Main alarms
4.4 AIS
4.5 Bridge alert management interface
5 Details of interfaces between sensors and VDR
5.1 General
5.2 Date and time (IEC 61996‑1:2013, 4.6.1)
126 5.3 Ship’s position (IEC 61996‑1:2013, 4.6.2)
5.4 Speed (IEC 61996‑1:2013, 4.6.3)
5.5 Heading (IEC 61996‑1:2013, 4.6.4)
127 5.6 Bridge audio (IEC 61996‑1:2013, 4.6.5)
5.7 VHF communication audio (IEC 61996‑1:2013, 4.6.6)
5.8 Radar data-post-display selection (IEC 61996‑1:2013, 4.6.7)
129 5.9 ECDIS (IEC 61996‑1:2013, 4.6.8)
130 5.10 Depth (Echo sounder) (IEC 61996‑1:2013, 4.6.9)
5.11 Main alarms on the bridge (IEC 61996‑1:2013, 4.6.10)
131 5.12 Rudder order and response (IEC 61996‑1:2013, 4.6.11)
5.12.1 Rudder order and response from HCS or TCS (if installed)
5.12.2 Rudder order and response from steering system
132 5.13 Engine and thruster order and response (IEC 61996‑1:2013, 4.6.12)
5.13.1 Engine order and response
5.13.2 Thruster order and response
133 5.14 Hull openings (doors) status (IEC 61996‑1:2013, 4.6.13)
5.15 Watertight and fire door status (IEC 61996‑1:2013, 4.6.14)
5.15.1 Watertight and fire door status
134 5.16 Accelerations and hull stresses (IEC 61996‑1:2013, 4.6.15)
5.17 Wind speed and direction (IEC 61996‑1:2013, 4.6.16)
5.18 AIS data (IEC 61996‑1:2013, 4.6.17)
135 5.19 Rolling motion (IEC 61996‑1:2013, 4.6.18)
5.20 Configuration (IEC 61996‑1:2013, 4.6.19)
5.21 Electronic logbook (IEC 61996‑1:2013, 4.6.20)
136 6 Installation
6.1 Required VDR equipment
6.2 Power supply of the VDR and interfaces
6.2.1 Power supply from the ship’s emergency source of electrical power
6.2.2 Power supply from the reserve power source
6.3 Installation of the protective capsule and float free capsule (IEC 61996‑1:2013, 5.1.1)
137 6.4 Positions of microphones (IEC 61996‑1:2013, 4.6.5)
6.5 Cable connections
6.6 Ship specific documentation
6.6.1 Planning and approval documentation
138 7 Acceptance test (Commissioning)
8 Performance Tests
8.1 General
8.2 Operational Performance Test (IEC 61996‑1:2013, 5.12)
139 8.3 Annual Performance Test
9 Download and playback equipment for investigation authorities
9.1 General
9.2 Information for use by an investigation authority (IEC 61996‑1)
140 Annex A (informative) Mandatory alarms (IEC 61996‑1:2013, Annex B)
143 Annex B (informative) LAN image protocol (IEC 61996‑1:2013, Annex E)
148 Annex C (informative) Network for image transmission (IEC 61996‑1:2013, Annex F)
151 Annex D (informative) ECDIS display source information (IEC 61996‑1:2013, Annex G)
157 Annex E (informative) Manufacturer’s documentation (IEC 61996‑1:2013, 5.5)
159 Annex F (informative) Performance test report (IMO Circular MSC.1/Circ.1222 Appendix)
164 Bibliography
BS ISO 22472:2016 - TC
$258.95