BS ISO/IEC 14143-6:2012
$142.49
Information technology. Software measurement. Functional size measurement – Guide for use of ISO/IEC 14143 series and related International Standards
Published By | Publication Date | Number of Pages |
BSI | 2012 | 32 |
This part of ISO/IEC 14143 provides a summary of the FSM-related standards and the relationship between;
-
the ISO/IEC 14143 series FSM framework International Standards that provide the definitions and concepts of FSM, and conformity and verification of FSMMs, and
-
the ISO/IEC standard FSMMs, i.e. ISO/IEC 19761, ISO/IEC 20926, ISO/IEC 20968, ISO/IEC 24570 and ISO/IEC 29881.
This part of ISO/IEC 14143 also provides a process to assist users to select and develop an FSMM that meets their requirements as well as providing guidance on how to use FS. FSMMs include, but are not limited to, ISO/IEC 19761, ISO/IEC 20926, ISO/IEC 20968, ISO/IEC 24570 and ISO/IEC 29881.
NOTE An FSMM is a software sizing method that conforms to the mandatory requirements of ISO/IEC 14143-1. Recommending a specific FSMM is outside the scope of this part of ISO/IEC 14143.
The audiences of this part of ISO/IEC 14143 are:
-
users and potential users of FSM; and
-
developers of an FSMM.
PDF Catalog
PDF Pages | PDF Title |
---|---|
9 | 1 Scope 2 Abbreviated terms |
10 | 3 FSM related standards (ISO/IEC 14143 series), FSMM standards, and their interrelationships 3.1 Outlines of FSM related standards 3.1.1 Overview 3.1.2 ISO/IEC 14143-1 3.1.3 ISO/IEC 14143-2 |
11 | 3.1.4 ISO/IEC TR 14143-3 3.1.5 ISO/IEC TR 14143-4 |
12 | 3.1.6 ISO/IEC TR 14143-5 3.2 Outlines of standardized FSMMs 3.2.1 Method Standards |
13 | 3.2.2 ISO/IEC 19761 3.2.3 ISO/IEC 20926 3.2.4 ISO/IEC 20968 3.2.5 ISO/IEC 24570 3.2.6 ISO/IEC 29881 |
14 | 3.3 Relationship between FSM related standards |
16 | 3.4 Guidelines for usage of FSM related standards 3.4.1 Guidelines for FSM users 3.4.2 Guidelines for FSMM developers 4 Use of FSM and FS 4.1 Overview |
17 | 4.2 Project management 4.2.1 Project resource forecasting 4.2.2 Tracking the progress of a project 4.2.3 Managing scope change 4.2.4 Package functionality fit 4.2.5 Post-mortem analysis |
18 | 4.3 Performance management 4.3.1 Productivity management 4.3.2 Quality management 4.3.3 Organizational maturity and process capability 4.3.4 Accounting for an organization’s software asset 4.3.5 Budgeting for maintenance 4.3.6 Contract management 5 FSMM selection and development processes 5.1 Outline |
19 | 5.2 Process to select a suitable FSMM 5.2.1 Overview of FSMM selection process 5.2.2 FSMM selection process 5.2.2.1 Characterization of organizational units |
20 | 5.2.2.2 Identification of information needs 5.2.3 Selection of the FSMM 5.2.3.1 Identify available FSMMs to be used |
21 | 5.2.3.2 Select the most appropriate FSMM 5.2.3.3 Document the results 5.2.4 Related activities of performing FSM 5.3 FSMM development process |