BSI 23/30420658 DC 2023
$13.70
BS ISO 4917-6. Design of Nuclear Power Plants against Seismic Events – Part 6. Post-Seismic Measures
Published By | Publication Date | Number of Pages |
BSI | 2023 | 21 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | Foreword |
7 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
10 | 4 Procedure 4.1 General Requirements 4.2 Verification of the Earthquake |
11 | 4.3 Classification of the Earthquake 4.4 Initial Measures 4.4.1 Plant check-up from the control room and plant walk-down inspection (Figureā¬2, Chart Item 3) |
12 | 4.4.2 Deviations caused by the earthquake (Figureā¬2, Chart Item 4) 4.4.3 Specified normal operation condition in accordance with the operating manual (Figureā¬2, Chart Item 5) 4.5 In-depth Measures 4.5.1 General 4.5.2 Special/Seismic inspections and analyses (Figureā¬2, Chart Item 6) |
13 | 4.5.3 Specified normal operation condition and permissible loads (Figureā¬2, Chart Item 7) 4.5.4 Shutdown inspection (Figureā¬2, Chart Item 9) 4.6 Resulting Measures 4.6.1 Continued operation (Figureā¬2, Chart Item 8) |
14 | 4.6.2 Shutting down the plant (Figureā¬2, Chart Item 10) 4.6.3 Additional procedures (Figureā¬2, Chart Item 11) |
16 | Annexā¬A (informative) Derivation of Factor f |
18 | Annexā¬B (informative) Directives for Plant Walk-Down Inspections |
19 | Annexā¬C (informative) Special/Seismic inspections |
21 | Bibliography |