BSI PAS 2030:2017
$54.81
Improving the energy efficiency of existing buildings. Specification for installation process, process management and service provision
Published By | Publication Date | Number of Pages |
BSI | 2017 | 204 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | Foreword |
7 | Introduction |
9 | 1 Scope |
10 | 2 Normative references 3 Terms and definitions |
12 | 4 The EEM design 4.1 Installer responsibility to be in possession of a location specific EEM design 4.2 EEM design validation |
15 | 5 Installation process 5.1 Installation method statement 5.2 Installation equipment and tools |
16 | 5.3 Checking, handling and storage of materials and supplies 5.4 Provision of installation instructions to operatives 5.5 People 5.6 Engagement of subcontract installers |
17 | 5.7 Commissioning 5.8 Handover 5.9 Installation control 5.10 Installation documents and record keeping |
18 | 6 Installation process management 6.1 Operation and process oversight 6.2 Preinstallation building inspection |
19 | 6.3 Action in respect of Intermediate inspection 6.4 Installation process change 6.5 Process continuity plan |
20 | 6.6 Process control 6.7 Internal audit and corrective action 6.8 Installation process records 6.9 Business and financial probity |
21 | 7 Service provision 7.1 Complaints procedure 7.2 Complaints records 7.3 Interaction with customers |
22 | 8 Claims of compliance 8.1 Requirement to claim 8.2 Claims in respect of installer designed installations 8.3 Claims in respect of independent third party designed installations |
24 | 9 Documents essential to the application of the Annexes of this PAS 9.1 Use of the identified documents 9.2 British Standards |
26 | 9.3 Institution of Gas Engineer and Managers ā Standards 9.4 Energy Networks Association Engineering Recommendations 9.5 UKLPG 9.6 Department of Communities and Local Government 9.7 Common, Minimum Technical Competence (MTC) Annexes |
28 | 9.8 National occupational Standards (NOS) |
30 | 9.9 Other insulation installation guidance references. |
32 | Annex A Measure specific Annex selection and coāinstallation requirements Table A.1 ā Category BFM (Building Fabric Measures) |
33 | Table A.2 ā Category BSM (Building Services Mechanical) |
34 | Table A.3 ā Category BSE (Building Services Electrical) |
38 | Table A.4 ā Guidance for the provision of ventilation when installing EEM in existing buildings with air permeability levels >5m3/hr/m2 |
39 | Table A.5 ā Minimum levels of background and extract ventilation in conditions described in Table A.4 |
40 | Table A.6 ā Minimum levels of extract and supply ventilation when continuous extraction is used |
41 | Annex B (normative) BFM energy efficiency measures Table B.1 ā Measure specific requirements for cavity wall insulation (BFM.1) |
46 | Table B.2 ā Measureāspecific requirements for draught proofing (BFM.2) |
51 | Table B.3 ā Measureāspecific requirements for energy efficient glazing and doors (BFM.3) |
56 | Table B.4 ā Measureāspecific requirements for external wall insulation (BFM.4) |
63 | Table B.5 ā Measureāspecific requirements for flat roof insulation (BFM.5) |
69 | Table B.6 ā Measureāspecific requirements for floor insulation (BFM.6) |
75 | Table B.7 ā Measureāspecific requirements for hybrid wall insulation (BFM.7) |
83 | Table B.8 ā Measureāspecific requirements for internal wall insulation (BFM.8) |
90 | Table B.9 ā Measure specific requirements for loft insulation (BFM.9) |
95 | Table B.10 ā Measureāspecific requirements for pitched roof insulation (BFM.10) |
100 | Table B.11 ā Solar Blinds, Shutters and Shading Devices (BFM.11) |
105 | Table B.12 ā Roomāināroof insulation (BFM12) |
110 | Annex C (normative) BSM energy efficiency measures (normative) |
111 | Table C.1 ā Measureāspecific requirements for chiller units (BSM.1) |
116 | Table C.2 ā Measureāspecific requirements for gasāfired condensing boilers (BSM.2) |
122 | Table C.3 ā Measureāspecific requirements for oilāfired condensing boilers (BSM.3) |
127 | Table C.4 ā Measureāspecific requirements for flueāgas recovery devices (BSM.4) |
131 | Table C.5 ā Measureāspecific requirements for heating system insulation (including ducting, pipes and cylinders) (BSM.5) |
136 | Table C.6 ā Measureāspecific requirements for Heating, hot water system, air conditioning or ventilation controls and components (BSM.6) |
142 | Table C.7 ā Measureāspecific requirements for hot water systems (BSM.7) |
148 | Table C.8 ā Measureāspecific requirements for Mechanical Ventilation and Heat Recovery (BSM.8) |
154 | Table C.9 ā Measureāspecific requirements for Radiant heating (BSM.9) |
159 | Table C.10 ā Measureāspecific requirements for underāfloor heating (BSM.10) |
164 | Table C.11 ā Measureāspecific requirements for gas and /or oilāfired warmāair heating systems (domestic and nonādomestic) (BSM.11) |
170 | Table C.12 ā Water efficient taps and showers (BSM.12) |
176 | Annex D (normative) BSE energy efficiency measures Table D.1 ā Measureāspecific requirements for Electric storage heaters (BSE.1) |
181 | Table D.2 ā Measureāspecific requirements for Lighting fittings, lighting systems and lighting system controls (BSE.2) |
184 | Table D.3 ā Variable speed drives for fans and pumps (BSE.3) |
187 | Annex E (informative) PAS 2030:2014/PAS 2030:2017 ā Substantive change Table E.1 ā Substantive change introduced in PAS 2030:2017 |
189 | Annex F (informative) Installer guidance on the use and application of PASĀ 2030:2017 |
192 | AnnexĀ G (informative) Example installation project information collation form |