Shopping Cart

No products in the cart.

BSI PD ISO/IEC TR 29110-5-1-1:2012

$167.15

Software engineering. Lifecycle profiles for Very Small Entities (VSEs) – Management and engineering guide: Generic profile group: Entry profile

Published By Publication Date Number of Pages
BSI 2012 42
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

1.1 Fields of application

This part of ISO/IEC 29110 is applicable to Very Small Entities (VSEs). VSEs are enterprises, organizations, departments or projects up to 25 people. The life cycle processes described in the set of International Standards (IS) Profiles and Technical Reports (TR) are not intended to preclude or discourage their use by organizations bigger than VSEs.

This part of ISO/IEC 29110 provides the management and engineering guide to the Entry profile described in ISO/IEC 29110-4-1 through project management and software implementation processes. This part of ISO/IEC 29110 is a stand alone guide. It is not intended for a VSE to use the standardized profile to implement this part of the ISO/IEC 29110.

This part of ISO/IEC 29110 applies for software development project. The project may be to fulfil an external or internal contract. The internal contract need not be explicit between the project team and their customer.

Using this part of ISO/IEC 29110, a VSE can obtain the following benefits:

  • An agreed set of project requirements and expected products is delivered to the customer;

  • A disciplined management process, that provides project visibility and corrective actions of project problems and deviations, is performed;

  • A systematic software implementation process, that satisfies customer needs and ensures quality products, is followed.

1.2 Target Audience

This part of ISO/IEC 29110 is targeted at start-up VSEs (i.e. VSEs who started their operation less than 3 years) and/or at VSEs working on small project (e.g. project size of less than 6 person-months).

It is intended to be used with any processes, techniques and methods that enhance the VSE’s Customer satisfaction and productivity.

PDF Catalog

PDF Pages PDF Title
10 1 Scope
1.1 Fields of application
1.2 Target Audience
2 Normative references
11 3 Terms and definitions
4 Symbols (and abbreviated terms)
4.1 Naming, diagramming and definition conventions
12 4.2 Abbreviations
5 Overview
13 6 Project Management (PM) process
6.1 PM purpose
14 6.2 PM objectives
16 6.3 PM input products
17 6.4 PM output products
6.5 PM internal products
6.6 PM roles involved
6.7 PM diagram
6.7.1 Overview
18 6.7.2 PM activities
PM.1 Project planning, (PM.O1, PM.O5, PM.O6, PM.O7)
20 PM.2 Project plan execution (PM.O2, PM.O3, PM.O4, PM.O5, PM.O7)
21 PM.3 Project assessment and control (PM.O2)
22 6.7.3 PM incorporation to Project Repository
23 7 Software Implementation (SI) process
7.1 SI purpose
7.2 SI objectives
25 7.3 SI input products
7.4 SI output products
7.5 SI internal products
26 7.6 SI roles involved
7.7 SI diagram
27 7.7.1 SI activities
28 SI.1 Software Implementation initiation (SI.O1)
SI.2 Software requirements analysis (SI.O2, SI.O6, SI.O7)
29 SI.3 Software component identification (SI.O3, SI.O6, SI.O7)
SI.4 Software construction (SI.O4, SI.O6, SI.O7)
30 SI.5 Software integration and tests (SI.O5, SI.O6, SI.O7)
32 7.7.2 SI incorporation to the Project Repository
8 Roles
9 Product description
37 10 Software tools
10.1 Project Management process
38 10.2 Software Implementation process
BSI PD ISO/IEC TR 29110-5-1-1:2012
$167.15