{"id":160825,"date":"2024-10-19T09:39:38","date_gmt":"2024-10-19T09:39:38","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-351-5-15\/"},"modified":"2024-10-25T01:58:20","modified_gmt":"2024-10-25T01:58:20","slug":"aci-351-5-15","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-351-5-15\/","title":{"rendered":"ACI 351.5 15"},"content":{"rendered":"
This specification covers minimum requirements for epoxy grouting between foundations and equipment bases. Included are requirements for materials, placement, and quality control. Keywords: epoxy grout; foundations; grout.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | TITLE PAGE PART 1\u2014GENERAL 1.1\u2014Scope <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | 1.2\u2014Interpretation 1.3\u2014Definitions 1.4\u2014Reference standards 1.5\u2014Submittals 1.6\u2014Delivery, storage, and handling 1.7\u2014Quality assurance and control <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1.8\u2014Acceptance of work <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | PART 2\u2014PRODUCTS 2.1\u2014Materials 2.2\u2014Accessories PART 3\u2014EXECUTION 3.1\u2014Preparation <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 3.2\u2014Installation 3.3\u2014Testing and inspection 3.4\u2014Repair 3.5\u2014Cleaning <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | NOTES TO SPECIFIER General notes Foreword to checklists <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | MANDATORY REQUIREMENTS CHECKLIST <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 351.5-15 Specification for Installation of Epoxy Grout between Foundations and Equipment Bases<\/b><\/p>\n |