{"id":265225,"date":"2024-10-19T17:41:27","date_gmt":"2024-10-19T17:41:27","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-7121-32017\/"},"modified":"2024-10-25T13:37:45","modified_gmt":"2024-10-25T13:37:45","slug":"bs-7121-32017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-7121-32017\/","title":{"rendered":"BS 7121-3:2017"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Figure 1 \u2014 All-terrain crane Figure 2 \u2014 Crawler crane <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Figure 3 \u2014 Low-headroom crane <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Figure 4 \u2014 Mobile self-erecting tower crane <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Figure 5 \u2014 Road-rail crane Figure 6 \u2014 Rough-terrain crane <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Figure 7 \u2014 Spider crane <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Figure 8 \u2014 Truck-mounted crane <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Figure 9 \u2014 Yard crane 4 Management of installation and lifting operations 4.1 Safe system of work <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.2 Control of the lifting operation <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.3 Duties of the person appointed to control the lifting operation <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Table 1 \u2014 Example load and environmental hazards associated with lifting operations <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Figure 10 \u2014 Relationship between complexity index and lift category <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Table 2 \u2014 Illustration of the categorization of lifts based on environmental and load complexities <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5 Planning of the lifting operation 5.1 General <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.2 Risk assessment <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.3 Method statement <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.4 Team briefing\/induction 5.5 Selection of cranes 5.6 Siting of crane 5.7 Contracts <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6 Selection and duties of personnel other than the appointed person 7 Selection of cranes 7.1 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 7.2 Truck-mounted crane <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.3 Rough-terrain crane 7.4 All-terrain crane 7.5 Yard crane 7.6 Low-headroom crane 7.7 Crawler crane <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.8 Spider cranes 7.9 Jib configurations <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.10 Main jib extensions 7.11 Special operations <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 8 Siting of cranes 8.1 General 8.2 Crane standing or support conditions <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Figure 11 \u2014 Packing for outriggers\/stabilizers <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Figure 12 \u2014 Position of outrigger mat 8.3 Proximity hazards <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Figure 13 \u2014 Minimum exclusion zone distances <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 9 Safety 9.1 General 9.2 Modifications and materials 9.3 Identification of person directing crane movements 9.4 Personal protective equipment (PPE) and safety equipment <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 9.5 Work at height 9.6 Access and egress (including emergency escape) 9.7 Fire extinguishers <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 9.8 Limiting and indicating devices 9.9 Machinery guarding <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 10 Crane documentation 10.1 Rated capacity charts 10.2 Instruction manuals 10.3 Reports of thorough examination\/test certificates 10.4 Maintenance records 11 Rigging and de-rigging 11.1 Planning <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 11.2 Manufacturer’s rigging and de-rigging instructions 11.3 Identification of components 11.4 Electrical supply 12 Procedures and precautions 12.1 Crane operation <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 12.2 Rated capacity <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Figure 14 \u2014 Control of pendulum swinging of load 12.3 Mode of operation and control <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 12.4 Working on cranes 12.5 Reporting of defects and incidents 12.6 Leaving the crane unattended 13 Pre-use checks, maintenance and inspection <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 14 Thorough examination, including testing 15 Multiple lifting and lowering 15.1 General <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 15.2 Main factors to be considered when planning multiple lifting <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 16 Weather conditions 16.1 General 16.2 Wind <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 16.3 Visibility 16.4 Rain or snow\/ice 16.5 Water condition 17 Out-of-service conditions 17.1 General 17.2 Thunderstorms 17.3 On-site travel <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 17.4 Movement to site 18 Slinging and handling of loads <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 19 Signalling systems 20 Special applications of cranes 20.1 General 20.2 Raising or lowering of personnel <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 20.3 Grabbing and magnet crane services 20.4 Magnet service 20.5 Vacuum lifting devices 20.6 Demolition: balling operations 20.7 Dynamic compaction <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Annex A (informative)\u2002 Road-rail cranes Figure A.1 \u2014 Road-rail crane Figure A.2 \u2014 Road-rail crane <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Annex B (informative)\u2002 Contract lift or crane hire <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Figure B.1 \u2014 Contract options Annex C (informative)\u2002 Loads imposed on the ground by mobile cranes <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Figure C.1 \u2014 Loadings on a mobile crane <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Figure C.2 \u2014 Effect of load and position on outrigger loads <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Figure C.3 \u2014 Effect of load and position on crawler track loads Annex D (normative)\u2002 Piling operations <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Annex E (normative)\u2002 De-rigging operations <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Annex F (normative)\u2002 Non-recoverable lifts\/loads Annex G (normative)\u2002 Mobile cranes mounted on water-borne craft <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Figure G.1 \u2014 Typical flat top modular pontoon <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Figure G.2 \u2014 Typical ramp pontoon <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Code of practice for safe use of cranes – Mobile cranes<\/b><\/p>\n |