{"id":265520,"date":"2024-10-19T17:42:45","date_gmt":"2024-10-19T17:42:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-6037-22020\/"},"modified":"2024-10-25T13:40:20","modified_gmt":"2024-10-25T13:40:20","slug":"bs-6037-22020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-6037-22020\/","title":{"rendered":"BS 6037-2:2020"},"content":{"rendered":"
This part of BS 6037 gives recommendations for the planning, design, installation, use, examination, maintenance and testing of permanently installed travelling ladders and gantries (TLGs) including equipment installed on a building to facilitate routine maintenance of the building fabric and its services. It is intended for use by those involved in specifying, designing, managing the use of, maintaining and examining such equipment.<\/p>\n
\nNOTE 1 For further information on underbridge gantries, see The operation and maintenance of bridge access gantries and runways [4].<\/p>\n<\/blockquote>\n
\nNOTE 2 Where TLGs are intended to be used in conjunction with suspended access equipment (SAE), this part of BS 6037 is supplemented by BS EN 1808 and BS 6037\u20111.<\/p>\n<\/blockquote>\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 5<\/td>\n Foreword <\/td>\n<\/tr>\n \n 7<\/td>\n Introduction
1 Scope <\/td>\n<\/tr>\n\n 8<\/td>\n 2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n\n 9<\/td>\n 4 Identifying hazards and taking preventative action
4.1 At design stage
4.2 At installation, use, inspection and maintenance stages <\/td>\n<\/tr>\n\n 10<\/td>\n Table 1 \u2014 Hazards encountered when installing, maintaining, inspecting and using TLGs, and recommended actions <\/td>\n<\/tr>\n \n 11<\/td>\n 5 Planning and exchange of information
5.1 Planning <\/td>\n<\/tr>\n\n 12<\/td>\n 5.2 Exchange of information <\/td>\n<\/tr>\n \n 13<\/td>\n 6 Health and safety
6.1 General
6.2 Safe access and egress <\/td>\n<\/tr>\n\n 14<\/td>\n 6.3 Safe use
Table 2 \u2014 Safe use of TLGs
6.4 Emergency planning
7 Attachment of the TLG to the building
7.1 Loads on the building
7.2 Anchor units <\/td>\n<\/tr>\n\n 15<\/td>\n 7.3 Examination
7.4 Installation of TLGs on existing buildings
8 Track system
8.1 Rail track <\/td>\n<\/tr>\n\n 16<\/td>\n 8.2 Mechanical stops
9 Design and construction of TLGs
9.1 Design of TLGs <\/td>\n<\/tr>\n\n 18<\/td>\n 9.2 Construction of TLGs <\/td>\n<\/tr>\n \n 20<\/td>\n 9.3 Construction of box ladders
9.4 Construction of variable geometry TLGs (curved or faceted)
9.5 Travelling mast climbing work platforms <\/td>\n<\/tr>\n\n 21<\/td>\n 10 Ancillary features of TLGs
10.1 General
10.2 Tower sections
10.3 Mobile elevating work platforms (MEWPs) <\/td>\n<\/tr>\n\n 22<\/td>\n 10.4 Extending TLG sections
10.5 Underslung rails and anchorage points
10.6 Movable platforms for ladders
11 Protection against lightning
12 Electrical systems
12.1 General <\/td>\n<\/tr>\n\n 23<\/td>\n 12.2 Mains power supply
12.3 Power supply cables
12.4 Electrical safeguards
13 Hydraulic and pneumatic systems
14 Control systems
14.1 Safety related controls <\/td>\n<\/tr>\n\n 24<\/td>\n 14.2 Layout and operation of controls
15 Safety devices
16 Marking <\/td>\n<\/tr>\n\n 25<\/td>\n 17 Commissioning, verification and handover
18 Responsibilities of the duty holder <\/td>\n<\/tr>\n\n 26<\/td>\n 19 Operating instructions
19.1 General
19.2 Content of operating instructions <\/td>\n<\/tr>\n\n 27<\/td>\n 20 Instructions for use
20.1 Documentation\/paperwork
20.2 Site checks <\/td>\n<\/tr>\n\n 28<\/td>\n 20.3 Equipment and pre-use checks <\/td>\n<\/tr>\n \n 29<\/td>\n 20.4 Safe use of the TLG
20.5 Access, egress and operation of the TLG <\/td>\n<\/tr>\n\n 30<\/td>\n 21 Provision of notices
22 Training and instruction <\/td>\n<\/tr>\n\n 31<\/td>\n 23 Inspections, maintenance, thorough examinations and testing
23.1 General
23.2 Inspections and maintenance <\/td>\n<\/tr>\n\n 32<\/td>\n 23.3 Load testing
23.4 Thorough examinations <\/td>\n<\/tr>\n\n 33<\/td>\n 23.5 Supplementary tasks
23.6 Taking TLG out of service <\/td>\n<\/tr>\n\n 34<\/td>\n 24 Record keeping
25 Changes, renewal or upgrading of the TLG <\/td>\n<\/tr>\n\n 36<\/td>\n Annex A (normative)\u2002 Emergency planning considerations <\/td>\n<\/tr>\n \n 38<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Planning, design, installation and use of permanently installed access equipment – Travelling ladders and gantries. Code of practice<\/b><\/p>\n
\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2020<\/td>\n 40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":265529,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[838,2641],"product_tag":[],"class_list":{"0":"post-265520","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-53-020-99","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/265520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/265529"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=265520"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=265520"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=265520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}