{"id":29713,"date":"2024-10-17T03:20:17","date_gmt":"2024-10-17T03:20:17","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-ptc-50-02-ra09-2002\/"},"modified":"2024-10-24T14:14:01","modified_gmt":"2024-10-24T14:14:01","slug":"asme-ptc-50-02-ra09-2002","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-ptc-50-02-ra09-2002\/","title":{"rendered":"ASME PTC 50 02 RA09 2002"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | FIGURES TABLES <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | NOTICE <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | BOARD ROSTER <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 OBJECT AND SCOPE 1.1 OBJECT 1.2 SCOPE 1.3 TEST UNCERTAINTY <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2 DEFINITIONS AND DESCRIPTION OF TERMS 2.1 INTRODUCTION 2.2 FUEL CELL TYPES <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2.3 FUEL CELL POWER SYSTEMS 2.1 GENERIC FUEL CELL POWER SYSTEM DIAGRAM <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2.4 GENERAL FUEL CELL NOMENCLATURE 2.5 GENERAL DEFINITIONS <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3 GUIDING PRINCIPLES 3.1 INTRODUCTION 3.2 AGREEMENTS 3.3 TEST BOUNDARY 3.4 TEST PLAN <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.1 GENERIC FUEL CELL SYSTEM TEST BOUNDARY 3.2 FUEL CELL SYSTEM TEST BOUNDARY ILLUSTRATING INTERNAL SUBSYSTEMS <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 3.5 PREPARATION FOR TEST <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 3.6 PARAMETERS TO BE MEASURED OR DETERMINED DURING THE TEST PERIOD <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 3.7 OPERATION OF THE TEST 3.8 CALCULATION AND REPORTING OF RESULTS 3.1 MAXIMUM PERMISSIBLE VARIATIONS IN TEST OPERATING CONDITIONS <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 3.9 RECORDS <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4 INSTRUMENTS AND METHODS OF MEASUREMENT 4.1 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.2 CHECKLIST OF INSTRUMENTS AND APPARATUS <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.3 DETERMINATION OF OUTPUTS <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 4.4 DETERMINATION OF FUEL INPUT <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 4.1 POTENTIAL BIAS LIMIT FOR HEATING VALUES <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 4.5 DATA COLLECTION AND HANDLING <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 5 COMPUTATION OF RESULTS 5.1 INTRODUCTION 5.2 COMPUTATION OF INPUTS <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.3 COMPUTATION OF ELECTRIC POWER OUTPUT 5.4 COMPUTATION OF THERMAL AND MECHANICAL OUTPUTS <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.5 COMPUTATION OF AVERAGE NET POWER 5.6 COMPUTATION OF EFFICIENCIES <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.7 CORRECTION OF TEST RESULTS TO REFERENCE CONDITIONS <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6 TEST REPORT REQUIREMENTS 6.1 GENERAL REQUIREMENTS 6.2 EXECUTIVE SUMMARY 6.3 INTRODUCTION 6.4 INSTRUMENTATION 6.5 RESULTS <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.6 CONCLUSIONS 6.7 APPENDICES <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | MANDATORY APPENDIX I UNCERTAINTY ANALYSIS AND SAMPLE CALCULATION <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME PTC 50 Fuel Cell Power Systems Performance <\/b><\/p>\n |