{"id":386615,"date":"2024-10-20T03:36:13","date_gmt":"2024-10-20T03:36:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-22282-42021-tc\/"},"modified":"2024-10-26T06:34:46","modified_gmt":"2024-10-26T06:34:46","slug":"bs-en-iso-22282-42021-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-22282-42021-tc\/","title":{"rendered":"BS EN ISO 22282-4:2021 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30444330 <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | A-30396853 <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 3 Terms, definitions and symbols 3.1 Terms and definitions 3.2 Symbols 4 Equipment <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 5 Test procedure 5.1 Test preparation 5.1.1 General 5.1.2 Determining the discharge rate for the pumping test 5.2 Arranging the disposal of discharge water <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 5.3 Executing and equipping the well 5.3.1 Design of the test well <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 5.3.2 Installation procedure 5.3.3 Preparation of the well 5.4 Executing and equipping the piezometers 5.4.1 Installation procedure 5.4.2 Preparation of piezometers <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 5.5 Execution of the test 5.5.1 General 5.5.2 Pre-pumping monitoring 5.5.3 Preliminary pumping phase 5.5.4 Pumping test <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 5.5.5 Post-pumping monitoring <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 5.6 Uncertainty of measurement 5.7 Interruptions in pumping 5.8 Decommissioning 6 Test results <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 7 Reports 7.1 Field report 7.1.1 General 7.1.2 Installation record 7.1.3 Record of measured values and test results <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 7.2 Test report <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Annex A (informative) Record of measured values and test results of the pumping test \u2014 Example <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Annex B (informative) Determining the pumping test discharge <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Annex C (informative) Interpretation of the pumping test results <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Geotechnical investigation and testing. Geohydraulic testing – Pumping tests<\/b><\/p>\n |