{"id":386615,"date":"2024-10-20T03:36:13","date_gmt":"2024-10-20T03:36:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-22282-42021-tc\/"},"modified":"2024-10-26T06:34:46","modified_gmt":"2024-10-26T06:34:46","slug":"bs-en-iso-22282-42021-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-22282-42021-tc\/","title":{"rendered":"BS EN ISO 22282-4:2021 – TC"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n30444330 <\/td>\n<\/tr>\n
45<\/td>\nA-30396853 <\/td>\n<\/tr>\n
46<\/td>\nNational foreword <\/td>\n<\/tr>\n
48<\/td>\nEuropean foreword <\/td>\n<\/tr>\n
50<\/td>\nForeword <\/td>\n<\/tr>\n
51<\/td>\nIntroduction <\/td>\n<\/tr>\n
53<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
54<\/td>\n3 Terms, definitions and symbols
3.1 Terms and definitions
3.2 Symbols
4 Equipment <\/td>\n<\/tr>\n
55<\/td>\n5 Test procedure
5.1 Test preparation
5.1.1 General
5.1.2 Determining the discharge rate for the pumping test
5.2 Arranging the disposal of discharge water <\/td>\n<\/tr>\n
56<\/td>\n5.3 Executing and equipping the well
5.3.1 Design of the test well <\/td>\n<\/tr>\n
58<\/td>\n5.3.2 Installation procedure
5.3.3 Preparation of the well
5.4 Executing and equipping the piezometers
5.4.1 Installation procedure
5.4.2 Preparation of piezometers <\/td>\n<\/tr>\n
59<\/td>\n5.5 Execution of the test
5.5.1 General
5.5.2 Pre-pumping monitoring
5.5.3 Preliminary pumping phase
5.5.4 Pumping test <\/td>\n<\/tr>\n
60<\/td>\n5.5.5 Post-pumping monitoring <\/td>\n<\/tr>\n
61<\/td>\n5.6 Uncertainty of measurement
5.7 Interruptions in pumping
5.8 Decommissioning
6 Test results <\/td>\n<\/tr>\n
62<\/td>\n7 Reports
7.1 Field report
7.1.1 General
7.1.2 Installation record
7.1.3 Record of measured values and test results <\/td>\n<\/tr>\n
63<\/td>\n7.2 Test report <\/td>\n<\/tr>\n
64<\/td>\nAnnex A (informative) Record of measured values and test results of the pumping test \u2014 Example <\/td>\n<\/tr>\n
67<\/td>\nAnnex B (informative) Determining the pumping test discharge <\/td>\n<\/tr>\n
71<\/td>\nAnnex C (informative) Interpretation of the pumping test results <\/td>\n<\/tr>\n
79<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Geotechnical investigation and testing. Geohydraulic testing – Pumping tests<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2021<\/td>\n80<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":386623,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1225,2641],"product_tag":[],"class_list":{"0":"post-386615","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-010-30","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/386615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/386623"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=386615"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=386615"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=386615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}