{"id":431457,"date":"2024-10-20T07:28:21","date_gmt":"2024-10-20T07:28:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-ts-169012022-tc\/"},"modified":"2024-10-26T14:12:19","modified_gmt":"2024-10-26T14:12:19","slug":"bsi-pd-iso-ts-169012022-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-ts-169012022-tc\/","title":{"rendered":"BSI PD ISO\/TS 16901:2022 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30473309 <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | A-30456527 <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 4 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 5 Safety risk management 5.1 Decision support framework for risk management 5.2 Prescriptive safety or risk performance <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 5.3 Risk assessment in relation to project development <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | 6 Risk 6.1 What is risk <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 6.2 Safety philosophy and risk criteria 6.3 Risk control strategy 6.4 ALARP <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 6.5 Ways to express risk to people 6.5.1 General <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 6.5.2 Risk contours (RC) 6.5.3 Risk transects (RT) 6.5.4 Individual risk (IR) <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 6.5.5 Potential loss of life (PLL) 6.5.6 Fatal accident rate (FAR) 6.5.7 Cost to avert a fatality (CAF) 6.5.8 F\/N curves (FN) 6.5.9 Uncertainties in QRA <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 7 Methodologies 7.1 Main steps of risk assessment 7.2 Qualitative risk analysis 7.2.1 HAZID <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 7.2.2 Failure mode and effect analysis (FMEA) 7.2.3 Risk matrix 7.2.4 Bow-tie <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 7.2.5 HAZOP <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 7.2.6 SIL analysis 7.3 Quantitative analysis: consequence and impact assessment 7.3.1 General <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 7.3.2 Consequence assessment <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | 7.3.3 Impact assessment <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 7.4 Quantitative analysis: frequency assessment 7.4.1 General 7.4.2 Failure data 7.4.3 Consensus data 7.4.4 FAULT tree <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | 7.4.5 Event tree analysis (ETA) 7.4.6 Exceedance curves based on probabilistic simulations <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | 7.5 Risk assessments (consequence*frequency) 7.5.1 Risk assessment tools 7.5.2 Ad hoc developed risk assessment tools <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | 7.5.3 Proprietary risk assessment tools 8 Accident scenarios 8.1 Overview accident scenarios <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 8.2 LNG import facilities including SIMOPS <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 8.3 LNG export facilities <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | 9 Standard presentation of risk <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Annex A (informative) Impact criteria <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Annex B (informative) Chain of events following release scenarios <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Guidance on performing risk assessment in the design of onshore LNG installations including the ship\/shore interface<\/b><\/p>\n |