{"id":439356,"date":"2024-10-20T08:08:37","date_gmt":"2024-10-20T08:08:37","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-79092023-tc\/"},"modified":"2024-10-26T15:15:28","modified_gmt":"2024-10-26T15:15:28","slug":"bs-79092023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-79092023-tc\/","title":{"rendered":"BS 7909:2023 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | compares BS 7909:2023 <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | TRACKED CHANGES Text example 1 \u2014 indicates added text (in green) <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | 0 Introduction 1 Scope <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | 4 Management of an event and supply of equipment for temporary electrical systems 4.1 Management of the event <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | 4.2 Outlining the parameters of the event 4.3 Responsibility for the temporary electrical system(s) <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | 4.4 Early planning 4.5 Provision of equipment <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | 5 Small\/simple events and activities requiring up to 6 kVA 5.1 General <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | 5.2 Person responsible 5.3 Planning the small\/simple temporary electrical system <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | 5.4 Risk assessments 5.5 Supplying and checking equipment 5.6 Setting\u2011up a small\/simple temporary electrical system <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | 5.7 Changes to the system 5.8 Leaving the system unattended 5.9 Removing the system <\/td>\n<\/tr>\n | ||||||
169<\/td>\n | 5.10 Problems with the installed electrical system 6 Large\/complex events and activities requiring in excess of 6 kVA 6.1 Responsibility <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | 6.2 Electrical supply <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | 6.3 Risk assessments <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | 6.4 Equipment 6.5 Crew 7 Design and instructions for temporary electrical systems 7.1 Design <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | 7.2 Electrical supplies <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | 7.3 Cables and connectors <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | Table 1 \u2014 Marking of conductors and single-pole connectors <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | Table 2 \u2014 Connector types <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | 7.4 Earthing and protective bonding <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | 7.5 Overcurrent protection for temporary systems <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | 7.6 RCDs in temporary systems <\/td>\n<\/tr>\n | ||||||
186<\/td>\n | 7.7 Surge protective devices (SPDs) <\/td>\n<\/tr>\n | ||||||
187<\/td>\n | 7.8 Equipment forming the temporary electrical system <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | Table 3 \u2014 Minimum IP protection (with all covers in place) 7.9 Machinery 7.10 Luminaires 7.11 Electronic equipment used for control and power-processing <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | 7.12 Sub-systems for associated services 7.13 Protection against unauthorized use 7.14 Safety systems 7.15 Weather conditions <\/td>\n<\/tr>\n | ||||||
190<\/td>\n | 7.16 Removal of temporary electrical systems 7.17 Electrical energy storage systems and hybrid generators for the provision of low voltage AC supplies <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | 8 Work on site 8.1 General 8.2 Responsibilities 8.3 Design assessment 8.4 Equipment assessment <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | 8.5 Live working 8.6 Connection to power supplies <\/td>\n<\/tr>\n | ||||||
194<\/td>\n | 8.7 Fundamental checks <\/td>\n<\/tr>\n | ||||||
195<\/td>\n | 8.8 Protection against damage and interference <\/td>\n<\/tr>\n | ||||||
196<\/td>\n | 8.9 Safe working practice <\/td>\n<\/tr>\n | ||||||
198<\/td>\n | 8.10 Communications 8.11 Weather conditions on site 8.12 Hazardous sites <\/td>\n<\/tr>\n | ||||||
199<\/td>\n | 8.13 Medical areas or locations 8.14 Agricultural areas 8.15 Signs and warning notices 8.16 Removal of temporary electrical systems after use 9 Inspection and testing 9.1 General <\/td>\n<\/tr>\n | ||||||
200<\/td>\n | 9.2 Person responsible 9.3 Records, results and certificates 9.4 Test and identification of equipment before delivery 9.5 Electrical systems brought by facilities providers <\/td>\n<\/tr>\n | ||||||
201<\/td>\n | 9.6 Supplies to facilities providers 9.7 Visual inspection <\/td>\n<\/tr>\n | ||||||
202<\/td>\n | 9.8 Tests <\/td>\n<\/tr>\n | ||||||
203<\/td>\n | 9.9 Onsite assembly or modification 10 Operational procedures 10.1 Competent person present <\/td>\n<\/tr>\n | ||||||
204<\/td>\n | 10.2 Regular inspection 10.3 Supervision of temporary systems for safety 10.4 Site security 10.5 Site emergency services or procedures 10.6 Non\u2011load making and breaking connectors 10.7 RCD Override <\/td>\n<\/tr>\n | ||||||
205<\/td>\n | 11 Additional considerations 11.1 Protection against lightning 11.2 Discharge of static electricity <\/td>\n<\/tr>\n | ||||||
206<\/td>\n | Annex A (normative)\u2002 Construction of distribution equipment or switchgear for temporary systems <\/td>\n<\/tr>\n | ||||||
208<\/td>\n | Annex B (informative)\u2002 Distribution equipment functionality <\/td>\n<\/tr>\n | ||||||
211<\/td>\n | Table B.1 \u2014 Indicator colours <\/td>\n<\/tr>\n | ||||||
212<\/td>\n | Annex C (informative)\u2002 Earthing arrangements and temporary systems <\/td>\n<\/tr>\n | ||||||
222<\/td>\n | Annex D (informative)\u2002 Possible arrangements for temporary electrical systems <\/td>\n<\/tr>\n | ||||||
223<\/td>\n | Figure D.1 \u2014 Temporary electrical system: typical event\/theatre\/concert arrangements <\/td>\n<\/tr>\n | ||||||
224<\/td>\n | Figure D.2 \u2014 Temporary electrical system: typical film\/tv location <\/td>\n<\/tr>\n | ||||||
225<\/td>\n | Figure D.3 \u2014 Temporary electrical system: typical major event or festival <\/td>\n<\/tr>\n | ||||||
231<\/td>\n | Annex E (informative)\u2002 Residual current devices (RCDs): selection and use <\/td>\n<\/tr>\n | ||||||
232<\/td>\n | Table E.1 \u2014 Types of RCDs <\/td>\n<\/tr>\n | ||||||
233<\/td>\n | Table E.2 \u2014 Fault currents <\/td>\n<\/tr>\n | ||||||
234<\/td>\n | Table E.3 \u2014 RCD symbols <\/td>\n<\/tr>\n | ||||||
235<\/td>\n | Table E.4 \u2014 RCD standards <\/td>\n<\/tr>\n | ||||||
236<\/td>\n | Table E.5 \u2014 RCD applications <\/td>\n<\/tr>\n | ||||||
238<\/td>\n | Table E.6 \u2014 Test criteria <\/td>\n<\/tr>\n | ||||||
239<\/td>\n | Annex F (informative)\u2002 Supplies provided for temporary distributions at venues <\/td>\n<\/tr>\n | ||||||
241<\/td>\n | Figure F.1 \u2014 Typical section of a keyed single-pole connector (KSPC) <\/td>\n<\/tr>\n | ||||||
242<\/td>\n | Figure F.2 \u2014 Example of label for sources of supply <\/td>\n<\/tr>\n | ||||||
243<\/td>\n | Table F.1 \u2014 Connectors, circuit-breaker and RCD ratings at the venue Annex G (normative)\u2002 Inspection, testing and certification <\/td>\n<\/tr>\n | ||||||
250<\/td>\n | Figure G.1 \u2014 Model completion certificate <\/td>\n<\/tr>\n | ||||||
252<\/td>\n | Figure G.2 \u2014 Model Schedule of Circuit Details and Test Results <\/td>\n<\/tr>\n | ||||||
253<\/td>\n | Figure G.3 \u2014 Model confirmation of electrical completion <\/td>\n<\/tr>\n | ||||||
254<\/td>\n | Annex H (informative)\u2002 Multi-pole connectors used for lighting and other applications <\/td>\n<\/tr>\n | ||||||
256<\/td>\n | Table H.1 \u2014 Rectangular 16-pole connector wiring configurations Table H.2 \u2014 Common rectangular 16-pole connector wiring configuration by country and manufacturer <\/td>\n<\/tr>\n | ||||||
257<\/td>\n | Table H.3 \u2014 Circular 19-pole connector wiring configurations Table H.4 \u2014 Common circular 19-pole connector wiring configuration by country and manufacturer <\/td>\n<\/tr>\n | ||||||
258<\/td>\n | Figure H.1 \u2014 Seven pin three-circuit connector Table H.5 \u2014 Seven pin three-circuit connector <\/td>\n<\/tr>\n | ||||||
259<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Temporary electrical systems for entertainment and related purposes. Code of practice<\/b><\/p>\n |