{"id":439431,"date":"2024-10-20T08:09:01","date_gmt":"2024-10-20T08:09:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-astm-529202023\/"},"modified":"2024-10-26T15:16:01","modified_gmt":"2024-10-26T15:16:01","slug":"bs-en-iso-astm-529202023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-astm-529202023\/","title":{"rendered":"BS EN ISO\/ASTM 52920:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.1 Environmental, health and safety (EHS) 5.2 Waste disposal 5.3 AM system installation <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.4 Ancillary equipment 5.5 Feedstock storage 5.6 IT infrastructure 5.7 Foreign object debris (FOD) 5.8 Provision of the process resources <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.9 Manufacturing management system 5.10 Maintenance\/calibration system 6.1 General 6.2 Design assessment and review <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.3 Manufacturing assessment and review 6.3.1 Additive manufacturing process 6.3.2 Process finalization 6.3.3 Post processing 7.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 7.2 Scope of qualification 7.3 Validation planning 7.3.1 Process mapping 7.3.2 Risk assessment <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7.3.3 Master validation plan 7.4 Qualification [installation, operation, and performance (IQ\/OQ\/PQ)] <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.5 Manufacturing plan specification <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7.6 Documentation and tracing of the process steps 7.6.1 General 7.6.2 Manufacturing plan 7.6.3 IQ documents <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.6.4 OQ\/PQ documents for the complete process 7.7 Relevant process steps within the additive system operations 7.7.1 Overview of additive system operations 7.7.2 Requirements for pre-process: data preparation <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.7.3 Requirements for feedstock management <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.7.4 Requirements for pre-process: system set-up <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.7.5 Requirements for additive manufacturing: build cycle <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.7.6 Requirements for AM-process: process finalization <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.1 General 8.2 Personnel requirements <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8.3 Non-conformities 8.3.1 General 8.3.2 Acceptance criteria 8.3.3 Handling of non-conformities <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8.4 Continuous improvement process 8.5 Quality controls 8.5.1 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.5.2 Production run approval <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 8.5.3 Part approval <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Additive manufacturing. Qualification principles. Requirements for industrial additive manufacturing processes and production sites<\/b><\/p>\n |