{"id":465524,"date":"2024-10-20T10:40:57","date_gmt":"2024-10-20T10:40:57","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-160-2023-2\/"},"modified":"2024-10-26T19:42:17","modified_gmt":"2024-10-26T19:42:17","slug":"ieee-c57-160-2023-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-160-2023-2\/","title":{"rendered":"IEEE C57.160-2023"},"content":{"rendered":"
New IEEE Standard – Active. The test procedure for electrical measurement of partial discharge (PD) in bushings and instrument transformers using wide-band measuring instruments for the evaluation of the apparent charge level of PD occurring under ac and dc test voltages is described in this guide.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.160\u2122-2023 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | List of Figures <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | List of Tables <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3.2\u2002Acronyms and abbreviations 4.\u2002Specification of PD measuring circuits 4.1\u2002General 4.2\u2002Test circuit and measuring system for alternating voltage <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.\u2002PD Calibration 5.1\u2002Typical PD limit and scale factor 5.2\u2002Calibration 5.3\u2002Calibrator capacitor C0 6.\u2002Bushing PD test 6.1\u2002Test requirements <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.2\u2002Preparation of the bushing for test 6.3\u2002Test circuit <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.4\u2002PD test, ac applications <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.5\u2002PD Test, dc applications <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.\u2002Instrument transformer PD test 7.1\u2002Preparation of the test object <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.2\u2002Instrument transformer test circuits 7.3\u2002Calibration <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 7.4\u2002PD Test <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Annex\u00a0A (informative) PD Patterns and Recognition A.1\u2002Scope <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex\u00a0B (informative) Calibrator apparent charge verification B.1\u2002Scope B.2\u2002Requirements <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex\u00a0C (informative) Test room and circuit conditions for sensitive PD testing C.1\u2002Introduction C.2\u2002Comparison of common test conditions under real test conditions <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | C.3\u2002Measures to reduce the influence of laboratory background noise <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | C.4\u2002Evaluation of electromagnetic noise in a Faraday cage construction <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | C.5\u2002Practical example and results <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Electrical Measurement of Partial Discharges in High Voltage Bushings and Instrument Transformers (Approved Draft)<\/b><\/p>\n |