{"id":81171,"date":"2024-10-17T18:52:00","date_gmt":"2024-10-17T18:52:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-125-2007\/"},"modified":"2024-10-24T19:45:54","modified_gmt":"2024-10-24T19:45:54","slug":"ieee-125-2007","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-125-2007\/","title":{"rendered":"IEEE 125 2007"},"content":{"rendered":"
Revision Standard – Active. This recommended practice is intended to assist users with the preparation of procurement specifications for electric-hydraulic speed governors. Remarks: Revision of ANSI\/IEEE Std 125-1988<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 125-2007, IEEE Recommended Practice for Preparation of Equipment Specifications for Speed-Governing of Hydraulic Turbines Intended to Drive Electric Generators <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Notice to users Errata Interpretations Patents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose 1.3 Disclaimer <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.4 Use of IEEE Std 125 2. Normative references <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4. Functions and characteristics 4.1 Control actuator position 4.2 Control actuator stroke 4.3 Control actuator time <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5. Equipment specifications 5.1 General specifications <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2 Governor and auxiliary functions <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3 Other optional functions <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.4 Hydraulic pressure supply system <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 5.5 New installation considerations <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 5.6 Replacement and conversion considerations <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 5.7 Redundancy 5.8 Failsafe features <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5.9 Dual-regulated turbines <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.10 Additional governor-controller functions <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.11 Environmental specifications <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.12 Software <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.13 Interface to other plant systems <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.14 Operator interface 5.15 Personnel safety features <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.16 Spare parts and accessories <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 5.17 Product support 6. Performance specification 6.1 Stability <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.2 Permanent speed droop 6.3 Deadband <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.4 Deadtime 6.5 Governor damping adjustments <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 7. Information provided by the manufacturer 7.1 Information to be provided at the time of submission of proposals 7.2 Information to be provided after contract award <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 7.3 Test procedures <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 7.4 Rehabilitation and conversion considerations 8. Governor testing 8.1 Factory acceptance testing <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 8.2 On-site acceptance testing <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 9. Information provided by the specifier <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Annex B (informative) Glossary <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Annex C (normative) Mode control logic <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Annex D (normative) Tables <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Preparation of Equipment Specifications for Speed-Governing of Hydraulic Turbines Intended to Drive Electric Generators<\/b><\/p>\n |