Shopping Cart

No products in the cart.

CA CityofSanDiego Whitebook 2015

$23.40

City of San Diego, The “Whitebook”, Standard Specifications For Public Works Construction

Published By Publication Date Number of Pages
CA 2015 546
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
3 Introduction
5 Table of Contents
8 Part 1 – General Provisions (A)
Section 1 – Terms, Definitions, Abbreviations, Units of Measure, and Symbols
18 Section 2 – Scope and Control of the Work
38 Section 3 – Changes in Work
46 Section 4 – Control of Materials
52 Section 5 – Utilities
54 Section 6 – Prosecution, Progress, and Acceptance of the Work
77 Section 7 – Responsibilities of the Contractor
154 Section 8 – Facilities for Agency Personnel
157 Section 9 – Measurement and Payment
167 Part 1 – General Provisions (B) Job Order Contract (JOC) Only
Section 1 – Terms, Definitions, Abbreviations, Units of Measure, and Symbols
169 Section 2 – Scope and Control of the Work
173 Section 3 – Changes in Work
174 Section 6 – Prosecution, Progress, and Acceptance of the Work
175 Section 7 – Responsibilities of the Contractor
176 Part 1 – General Provisions (C) Design-Build (DB) and Multiple Award Construction Contract (MACC) Contracting Only
Section 1 – Terms, Definitions, Abbreviations, Units of Measure, and Symbols
178 Section 2 – Scope and Control of Work
186 Section 3 – Changes in Work
188 Section 4 – Control of Materials
189 Section 5 – Utilities
190 Section 6 – Prosecution, Progress, and Acceptance of the Work
191 Section 7 – Responsibilities of the Contractor
194 Section 9 – Measurement and Payment
195 Section 10 – Green Buildings and Storm Water Management
196 Part 2 – Construction Materials
Section 200 – Rock Materials
202 Section 201 – Concrete, Mortar, and Related Materials
206 Section 202 – Masonry Materials
207 Section 203 – Bituminous Materials
216 Section 206 – Miscellaneous Metal Items
217 Section 207 – Gravity Pipe
223 Section 209 – Pressure Pipe
233 Section 210 – Paint and Protective Coatings
234 Section 211 – Material Tests
235 Section 212 – Water and Sewer System Valves and Appurtenances
241 Section 213 – Engineering Geosynthetics
245 Section 215 – Private Sewer Pumps
246 Section 218 – Detectable Warning Tiles
247 Part 3 – Construction Methods
Section 300 – Earthwork
253 Section 301 – Treated Soil, Subgrade Preparation, and Placement of Base Materials
260 Section 302 – Roadway Surfacing
282 Section 303 – Concrete and Masonry Construction
290 Section 304 – Metal Fabrication and Construction
291 Section 306 – Open Trench Conduit Construction
330 Section 307 – Jacking and Tunneling
331 Section 308 – Microtunneling
332 Section 309 – Monuments
333 Section 314 – Traffic Striping, Curb and Pavement Markings, and Pavement Markers
334 Section 315 – Horizontal Directional Drilling
341 Section 316 – Pipe Bursting
344 Section 317 – Pipe Fusion
352 Part 4 – NOT USED – Control of Materials
353 Part 5 – Pipeline System Rehabilitation
Section 500 – Pipeline, Manhole, and Structure Rehabilitation
375 Part 6 -Temporary Traffic Control
Section 600 – Access
379 Section 601 – Temporary Traffic Control for Construction and Maintenance Work Zones
393 Part 7 – Street Lighting and Traffic Signal Systems
Section 700 – Materials
447 Section 701 – Construction
451 Part 8 – Landscaping and Irrigation
Section 800 – Materials
471 Section 801 – Installation
488 Section 802 – Native Habitat Protection, Installation, Maintenance, and Monitoring
500 Part 9 – Water Works
Section 900 – Materials
511 Section 901 – Installation and Connection
525 Part 10 – Equal Opportunity Contracting Program (EOCP)
Section A – General Requirements
534 Section B – SLBE-ELBE Subcontracting Requirements
542 Index
CA CityofSanDiego Whitebook 2015
$23.40