{"id":346694,"date":"2024-10-20T00:22:23","date_gmt":"2024-10-20T00:22:23","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-265552013\/"},"modified":"2024-10-25T23:49:57","modified_gmt":"2024-10-25T23:49:57","slug":"bs-iso-iec-265552013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-265552013\/","title":{"rendered":"BS ISO\/IEC 26555:2013"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
11<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
12<\/td>\n4 Reference model for product line technical management <\/td>\n<\/tr>\n
16<\/td>\n5 Process management <\/td>\n<\/tr>\n
17<\/td>\n5.1 Applying process enabling processes for product lines
5.1.1 Establish process management group <\/td>\n<\/tr>\n
18<\/td>\n5.1.2 Align resources for process definition and improvements <\/td>\n<\/tr>\n
19<\/td>\n5.1.3 Govern process definition and improvement
5.1.4 Prepare process management and improvement <\/td>\n<\/tr>\n
20<\/td>\n5.2 Domain engineering process definition
5.2.1 Define domain engineering processes <\/td>\n<\/tr>\n
21<\/td>\n5.2.2 Validate domain engineering processes
5.2.3 Deploy the domain engineering processes <\/td>\n<\/tr>\n
22<\/td>\n5.3 Application engineering process definition
5.3.1 Define application engineering processes <\/td>\n<\/tr>\n
23<\/td>\n5.3.2 Validate the conformance of application engineering processes with domain engineering processes <\/td>\n<\/tr>\n
24<\/td>\n5.3.3 Deploy the application engineering processes
5.4 Applying process monitoring and control for product lines <\/td>\n<\/tr>\n
25<\/td>\n5.4.1 Plan for process monitoring and control
5.4.2 Define process performance measures
5.4.3 Measure and manage process performance <\/td>\n<\/tr>\n
26<\/td>\n5.4.4 Coordinate processes for improving reusability
5.5 Applying process improvement for product lines <\/td>\n<\/tr>\n
27<\/td>\n5.5.1 Assess processes <\/td>\n<\/tr>\n
28<\/td>\n5.5.2 Estimate the impact of changes on processes
5.5.3 Plan process improvement
5.5.4 Implement process improvements <\/td>\n<\/tr>\n
29<\/td>\n5.5.5 Evaluate process improvement
6 Variability management <\/td>\n<\/tr>\n
30<\/td>\n6.1 Variability model management <\/td>\n<\/tr>\n
31<\/td>\n6.1.1 Establish variability modeling policy
6.1.2 Collect variability information <\/td>\n<\/tr>\n
32<\/td>\n6.1.3 Verify variability models
6.1.4 Share and maintain variability models <\/td>\n<\/tr>\n
33<\/td>\n6.2 Variability documentation management
6.2.1 Establish policies for variability documentation
6.2.2 Collect annotations of variability models <\/td>\n<\/tr>\n
34<\/td>\n6.2.3 Validate the variability documentation
6.3 Variability binding management <\/td>\n<\/tr>\n
35<\/td>\n6.3.1 Establish binding policy
6.3.2 Guide trade-offs analysis among alternatives of binding time
6.3.3 Guide binding time decision <\/td>\n<\/tr>\n
36<\/td>\n6.3.4 Maintain binding information
6.4 Variability tracing <\/td>\n<\/tr>\n
37<\/td>\n6.4.1 Establish policies for traceability management of variability models
6.4.2 Define links between variability model and domain assets
6.4.3 Manage the changes of the defined trace links <\/td>\n<\/tr>\n
38<\/td>\n6.5 Variability control and evolution
6.5.1 Identify and analyze the evolution needs of variants <\/td>\n<\/tr>\n
39<\/td>\n6.5.2 Add or remove variants
6.5.3 Add or remove dependencies and constraints
6.5.4 Change binding time <\/td>\n<\/tr>\n
40<\/td>\n6.5.5 Maintain the affected traceabilities
6.5.6 Provide feedback for variabilities and the variability evolution process
7 Asset Management <\/td>\n<\/tr>\n
41<\/td>\n7.1 Asset identification <\/td>\n<\/tr>\n
42<\/td>\n7.1.1 Set up and maintain organizational policies for managing assets
7.1.2 Identity asset candidates
7.1.3 Estimate efforts necessary to create, reuse, and update domain assets <\/td>\n<\/tr>\n
43<\/td>\n7.1.4 Determine assets
7.1.5 Elicit information necessary to reuse assets <\/td>\n<\/tr>\n
44<\/td>\n7.2 Asset base implementation
7.2.1 Establish the mining (retrieval) mechanism for assets <\/td>\n<\/tr>\n
45<\/td>\n7.2.2 Define and implement the CRUD method for assets
7.2.3 Establish asset base <\/td>\n<\/tr>\n
46<\/td>\n7.2.4 Evaluate asset base
7.3 Asset verification
7.3.1 Review the selected assets <\/td>\n<\/tr>\n
47<\/td>\n7.3.2 Review asset configurations
7.3.3 Create and release baselines of assets
7.4 Asset evolution (including change management) <\/td>\n<\/tr>\n
48<\/td>\n7.4.1 Manage asset changes <\/td>\n<\/tr>\n
49<\/td>\n7.4.2 Maintain traceability of assets
7.4.3 Manage feedback
7.4.4 Transform the existing assets into assets to rehabilitate asset base <\/td>\n<\/tr>\n
50<\/td>\n7.4.5 Dispose assets from asset base
8 Support management processes <\/td>\n<\/tr>\n
51<\/td>\n8.1 Technical quality management for SSPL
8.1.1 Establish technical quality management policy <\/td>\n<\/tr>\n
52<\/td>\n8.1.2 Establish and maintain criteria for quality assurance
8.1.3 Perform quality assurance according to criteria
8.1.4 Communicate and ensure resolution of noncompliance issues <\/td>\n<\/tr>\n
53<\/td>\n8.2 Configuration management for SSPL <\/td>\n<\/tr>\n
54<\/td>\n8.2.1 Identify configurations of member products
8.2.2 Establish configuration tree for a product line <\/td>\n<\/tr>\n
55<\/td>\n8.2.3 Manage configuration of variability in space <\/td>\n<\/tr>\n
56<\/td>\n8.3 Decision management for SSPL
8.3.1 Establish decision management policy <\/td>\n<\/tr>\n
57<\/td>\n8.3.2 Tailor decision procedure
8.3.3 Guide the decision execution
8.3.4 Learn from execution results <\/td>\n<\/tr>\n
58<\/td>\n8.4 Technical risk management for SSPL
8.4.1 Identify technical risks <\/td>\n<\/tr>\n
59<\/td>\n8.4.2 Assess technical risks
8.4.3 Develop technical risk mitigation plans
8.4.4 Activate the mitigation plan <\/td>\n<\/tr>\n
60<\/td>\n8.5 Tool management for SSPL
8.5.1 Identify needs for tool management <\/td>\n<\/tr>\n
61<\/td>\n8.5.2 Select and adapt tools
8.5.3 Set-up and maintain tools <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Software and systems engineering. Tools and methods for product line technical management<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2013<\/td>\n70<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":346699,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-346694","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/346694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/346699"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=346694"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=346694"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=346694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}