{"id":360017,"date":"2024-10-20T01:28:52","date_gmt":"2024-10-20T01:28:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-50600-12019-tc\/"},"modified":"2024-10-26T02:13:32","modified_gmt":"2024-10-26T02:13:32","slug":"bs-en-50600-12019-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-50600-12019-tc\/","title":{"rendered":"BS EN 50600-1:2019 – TC"},"content":{"rendered":"
This European Standard: a) details the issues to be addressed in a business risk and operating cost analysis enabling application of an appropriate classification of the data centre; b) defines the common aspects of data centres including terminology, parameters and reference models (functional elements and their accommodation) addressing both the size and complexity of their intended purpose; c) describes general aspects of the facilities and infrastructures required to support effective operation of telecommunications within data centres; d) specifies a classification system, based upon the key criteria of \u201c availability\u201d, \u201csecurity\u201d and \u201cenergy-efficiency\u201d over the planned lifetime of the data centre, for the provision of effective facilities and infrastructure; e) describes the general design principles for data centres upon which the requirements of the EN 50600 series are based including symbols, labels, coding in drawings, quality assurance and education.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
46<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 3 Terms, definitions and abbreviations 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 3.2 Abbreviations 4 Conformance <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 5 Business risk analysis 5.1 General 5.2 Business impact analysis <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 5.3 Risk analysis <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 6 Data centre design overview 6.1 General <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 6.2 Spaces and facilities <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 7 Classification system for the design of data centre facilities and infrastructures 7.1 General 7.2 Availability 7.2.1 General 7.2.2 Single-site data centres <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 7.2.3 Multi-site data centres 7.3 Physical security 7.3.1 General 7.3.2 Protection against unauthorised access 7.3.3 Protection against intrusion <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 7.3.4 Protection against environmental events 7.4 Energy efficiency enablement 7.4.1 General <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 7.4.2 Power distribution system 7.4.3 Environmental monitoring and control 7.4.4 Operational processes and KPIs 8 Design and implementation process 8.1 General <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 8.2 Design phases 8.2.1 Phase 1 – Strategy <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 8.2.2 Phase 2 – Objectives 8.2.3 Phase 3 – System specifications 8.2.4 Phase 4 – Design proposal <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 8.2.5 Phase 5 – Decision 8.2.6 Phase 6 – Functional design 8.2.7 Phase 7 – Approval 8.2.8 Phase 8 – Final design and project plan 8.2.9 Phase 9 – Contract 8.2.10 Phase 10 – Construction 8.2.11 Phase 11 – Operation <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 9 Design Principles 9.1 Design reference documentation 9.2 Design principles to support energy efficiency 9.3 Design principles for EMI 9.4 Design principles to support operational excellence <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Annex A (informative)Overall availability and infrastructure availability <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | Annex B (informative)Availability description <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Information technology. Data centre facilities and infrastructures – General concepts<\/b><\/p>\n |