{"id":411638,"date":"2024-10-20T05:46:06","date_gmt":"2024-10-20T05:46:06","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aisi-s202-2020\/"},"modified":"2024-10-26T10:40:26","modified_gmt":"2024-10-26T10:40:26","slug":"aisi-s202-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aisi\/aisi-s202-2020\/","title":{"rendered":"AISI S202 2020"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nDISCLAIMER <\/td>\n<\/tr>\n
4<\/td>\nPREFACE <\/td>\n<\/tr>\n
10<\/td>\nA. GENERAL
A1 Scope
A2 Definitions <\/td>\n<\/tr>\n
15<\/td>\nA3 Referenced Documents
A4 Responsibility for Identifying Construction Documents <\/td>\n<\/tr>\n
16<\/td>\nA5 Responsibility for Design <\/td>\n<\/tr>\n
18<\/td>\nB. CLASSIFICATION OF MATERIALS
B1 Definition of Cold-Formed Steel Structural Framing
B2 Other Items <\/td>\n<\/tr>\n
20<\/td>\nC. CONSTRUCTION DOCUMENTS
C1 Responsibilities
C2 Limit of Responsibility <\/td>\n<\/tr>\n
21<\/td>\nC3 Jurisdiction
C4 Discrepancies or Omissions
C5 Revisions <\/td>\n<\/tr>\n
23<\/td>\nD. INSTALLATION DOCUMENTS
D1 Owner Responsibility <\/td>\n<\/tr>\n
24<\/td>\nD2 Component Manufacturer and Installer Responsibility
D3 Review Process <\/td>\n<\/tr>\n
25<\/td>\nD4 General Responsibility <\/td>\n<\/tr>\n
26<\/td>\nE. MATERIALS
E1 Structural Members
E2 Fasteners and Connection Hardware
E3 Preparation of Material
E4 Member Identification
E5 Special Marking
E6 Camber <\/td>\n<\/tr>\n
27<\/td>\nF. INSTALLATION
F1 Scope
F2 Site Conditions
F3 Delivery, Handling and Storage of Materials <\/td>\n<\/tr>\n
28<\/td>\nF4 Field Modifications and Repairs
F5 Installation Tolerances
F6 Temporary Bracing <\/td>\n<\/tr>\n
30<\/td>\nG. QUALITY CONTROL
G1 General
G2 Material Inspection <\/td>\n<\/tr>\n
31<\/td>\nH. CONTRACTUAL RELATIONS
H1 Construction Documents and Contracts
H2 Presentation of Proposals
H3 Acceptance of Proposals
H4 Terms of Payment
H5 The RFI Process <\/td>\n<\/tr>\n
32<\/td>\nH6 Revisions to the Construction Documents and Contract
H7 Change Orders
H8 Contract Price Adjustment
H9 Scheduling <\/td>\n<\/tr>\n
33<\/td>\nI. PRACTICES SPECIFIC TO CFS COMPONENT ASSEMBLIES
I1 Truss Responsibilities
I1.1 Design of Trusses
I1.2 Responsibilities of Truss Design Engineer\/Truss Designer
I1.2.1 Preparation of Truss Design Drawings
I1.2.1.1 Truss Design Engineer
I1.2.1.2 Truss Designer
I1.2.2 Truss Design Criteria, Assumptions and Calculations
I1.2.3 Truss Design Drawings <\/td>\n<\/tr>\n
34<\/td>\nI1.2.4 Truss Design Drawings Seal and Signature
I1.3 Responsibilities of Truss Manufacturer
I1.3.1 Truss Design Criteria and Requirements <\/td>\n<\/tr>\n
35<\/td>\nI1.3.2 Communication to Truss Design Engineer
I1.3.3 Truss Placement Diagram or Model
I1.3.4 Truss Submittal Package
I1.3.5 Reliance on Construction Documents
I1.4 Responsibilities of Building Designer
I1.4.1 Preparation of Construction Documents
I1.4.2 Deferred Submittals
I1.4.3 Review Submittal Packages
I1.4.4 Required Information in Construction Documents <\/td>\n<\/tr>\n
37<\/td>\nI1.4.5 Permanent Individual Truss Member Restraint\/Bracing
I1.5 Responsibilities of Contractor
I1.5.1 Information Provided to Truss Manufacturer
I1.5.2 Information Provided to Building Designer
I1.5.3 Truss Submittal Package Review
I1.5.4 Means and Methods
I1.5.5 Truss Installation
I1.5.6 Alterations to Trusses <\/td>\n<\/tr>\n
38<\/td>\nI1.6 Design of Permanent Individual Truss Member Restraint\/Bracing
I2 Wall Panel Responsibilities
I2.1 Responsibilities of Wall Panel Detailer
I2.1.1 Wall Panel Fabrication Documents <\/td>\n<\/tr>\n
39<\/td>\nI2.1.2 Wall Panel Placement Diagram
I2.1.3 Reliance on Construction Documents
I2.2 Responsibilities of Wall Panel Manufacturer
I2.2.1 Coordination with Wall Panel Detailer and Wall Panel Installer
I2.2.2 Wall Panel Submittal Package
I2.2.3 Reliance on Construction Documents
I2.3 Responsibilities of Wall Panel Installer <\/td>\n<\/tr>\n
40<\/td>\nI2.4 Responsibilities of Contractor
I2.4.1 Information Provided to Wall Panel Manufacturer
I2.4.2 Means and Methods
I2.4.3 Wall Panel Installation
I2.4.4 Alterations to Wall Panels <\/td>\n<\/tr>\n
41<\/td>\nJ. PRACTICES SPECIFIC TO COORDINATION OF CFS STRUCTURAL FRAMING WITH OTHER TRADES AND MATERIALS
J1 Steel Floor and Roof Deck
J1.1 Responsibility of Building Designer
J1.1.1 Design Responsibility
J1.1.2 Required Information in Construction Documents <\/td>\n<\/tr>\n
42<\/td>\nJ1.1.3 Review Steel Deck Submittal Packages
J1.2 Responsibility of Steel Deck Support Framing Designers
J1.3 Responsibility of Steel Deck Supplier
J1.4 Responsibility of Contractor <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

AISI S202-20: Code of Standard Practice for Cold-Formed Steel Structural Framing, 2020 Edition<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
AISI<\/b><\/a><\/td>\n2020<\/td>\n44<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":411645,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2860],"product_tag":[],"class_list":{"0":"post-411638","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aisi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/411638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/411645"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=411638"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=411638"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=411638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}