{"id":72888,"date":"2024-10-17T16:25:28","date_gmt":"2024-10-17T16:25:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c530-2007-with-erratum-2008\/"},"modified":"2024-10-24T19:08:27","modified_gmt":"2024-10-24T19:08:27","slug":"awwa-c530-2007-with-erratum-2008","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c530-2007-with-erratum-2008\/","title":{"rendered":"AWWA C530 2007 with Erratum 2008"},"content":{"rendered":"
The purpose of this standard is to define the minimum requirements for pilot-operated control valves, including sizing considerations, design verification, testing, delivery, handling, and storage.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Erratum to ANSI\/AWWA C530-07Standard \n <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Committee Personnel <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Foreword I . Introduction. \n <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | II . Special Issues. \n <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | III . Use of This Standard. \n <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | IV. Major Revisions. \n V. Comments. \n <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | AWWA Standard Pilot-Operated Control Valves \n Section 1: \nGENERAL Sec . 1 .1 Scope \n <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Sec . 1 .2 Purpose \n Sec . 1 .3 Application \n Section 2: REFERENCES \n <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Section 3: \nDEFINITIONS <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Section 4: \nREQUIREMENTS Sec . 4 .1 \nData Provided by Manufacturer. \n <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Sec . 4 .2 \nMaterials. \n <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Sec . 4 .3 \nGeneral Design. \n <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Sec . 4 .4 \nWorkmanship and Painting. \n Sec . 4 .5 Permeation. \n <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Section 5: \nVERIFICATION Sec . 5 .1 \nInspection \n Sec . 5 .2 \nTesting \n <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Sec . 5 .3 Notice of Nonconformance \n Section 6: DELIVERY \n Sec. 6.1 Markings \n Sec. 6.2 Shipping \n <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Sec. 6.3 Affidavit of Compliance \n <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Appendix A Installation, Operation, and Maintenance \nPilot-Operated Control Valves Section A .1: \nGENERAL \n Section A .2: UNLOADING \n Section A .3: \nSTORAGE \n <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Section A .4: INSPECTION \n Section A .5: \nINSTALLATION \n <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Section A .6: \nRECORDS \n Section A .7: \nMAINTENANCE \n <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C530-07: Pilot Operated Control Valves With Erratum-200805<\/b><\/p>\n |