VA DesignManuals PG 18 10 dmCPM1
$16.25
VA Design Manuals (PG-18-10) – CPM Schedule and Risk Management – Volume 1, CPM Schedule
Published By | Publication Date | Number of Pages |
VeteransAffairs | N/A | 60 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | 1. INTRODUCTION 1.1. Purpose and Scope |
5 | 1.2. Applicable Documents |
6 | 1.3. Definitions and Abbreviations |
10 | 2. SCHEDULING METHOD 2.1. Introduction 2.2. Scheduling Software |
11 | 2.3. Assumptions 2.4. Scheduling Best Practices |
12 | 2.5. Risk Analysis |
13 | 2.6. Deliverables |
15 | 3. GUIDELINE FOR DEVELOPING AN INTEGRATED PROJECT MASTER SCHEDULE (IPMS) 3.1 Comprehension of the full scope of the project 3.1.1 Design |
16 | 3.1.2 Procurement 3.1.3 Construction |
17 | 3.1.4 Activation Planning/Beneficial Occupancy 3.2 Assign Unique Identifiers to the IPMS |
18 | 3.3 Work Breakdown Structure (WBS) |
20 | 3.4 Define Project Milestones 3.5 Establish Project Calendars and Work Periods |
21 | 3.6 Activity Identification/Coding 3.7 Activity Definition |
23 | 3.8 Activity Sequencing 3.9 Estimating Activity Duration |
24 | 3.10 Cost Loading Requirement |
25 | 3.11 Analyzing the Schedule Output 3.12 Narrative Report 3.13 Approving the Schedule |
26 | 3.14 Baselining the Schedule |
27 | 4 UPDATING/MAINTAINING THE INTEGRATED PROJECT MASTER SCHEDULE (IPMS) |
29 | 6. EXHIBITS Exhibit I.1. Level 1 Schedule for a Typical VAMC Project Exhibit I.2. Level 2 Schedule for a Typical SD-1 VAMC Project Exhibit I.3. Level 2 Schedule for a Typical Construction Phase in VAMC Project Exhibit I.4. Level 3 Schedule for a Typical SD-1 VAMC Project Exhibit I.5. Level 4 Schedule (60-day look ahead) for a Typical SD-1 VAMC Project Exhibit I.6. Sample Phasing Narrative for a Typical VAMC Project Exhibit I.7. Cost Projection S-Curve for a Typical Design Phase in VAMC Project Exhibit I.8. Sample Outline for a Schedule Narrative Report Exhibit I.9. Longest Path for a Typical Design Phase in VAMC Project Exhibit I.10. Schedule Impact Analysis – Sample Change Order Fragnet |