{"id":111467,"date":"2024-10-18T16:11:34","date_gmt":"2024-10-18T16:11:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1300-2012\/"},"modified":"2024-10-24T22:01:39","modified_gmt":"2024-10-24T22:01:39","slug":"ieee-1300-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1300-2012\/","title":{"rendered":"IEEE 1300 2012"},"content":{"rendered":"
Revision Standard – Active. This guide establishes typical dimensions for connections of a gas-insulated substation (GIS) to extruded, self contained fluid-filled, and high pressure fluid-filled (pipe-type) cables in single and three phase arrangements for voltages 72.5 kV to 550 kV.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1300-2011 Front Cover \n <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page \n <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction \n Notice to users \n Laws and regulations \n Copyrights \n Updating of IEEE documents \n Errata \n <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Interpretations \n Patents \n <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants \n <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents \n <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Important notice \n 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2. Normative references 3. Definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4. Limits of supply 4.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.2 Over voltage protection 5. Typical dimensions <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6. Ratings 6.1 General 6.2 Rated voltage 6.3 Rated impulse withstand voltage 6.4 Rated normal current and temperature rise <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.5 Rated short circuit fault current and rated duration of short circuit 6.6 Rated internal pressure of dielectric fluid for cable system 7. GIS compartment gas pressure 8. Dielectric-type test 8.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.2 Cable termination dielectric-type test 8.3 Cable connection enclosure dielectric-type test 8.4 Isolating gap 9. Mechanical force (short circuit and other) <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 10. Cable connection support structures 11. Grounding <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 12. Installation <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 13. Field tests 13.1 Dielectric field tests 13.2 Other field tests 14. Operation and maintenance <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 15. Special accessories 15.1 Vent and sample valve for fluid-filled cables 15.2 Detection of cable fluid leaks inside cable termination enclosure 15.3 Viewports 15.4 Treating\/sampling valve and maintenance opening <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Cable Connections for Gas-Insulated Substations<\/b><\/p>\n |