{"id":160890,"date":"2024-10-19T09:39:52","date_gmt":"2024-10-19T09:39:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-364-8t-02-2002\/"},"modified":"2024-10-25T01:58:32","modified_gmt":"2024-10-25T01:58:32","slug":"aci-364-8t-02-2002","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-364-8t-02-2002\/","title":{"rendered":"ACI 364.8T 02 2002"},"content":{"rendered":"
This TechNote provides an answer to the question, “Should hydrodemolition be used to remove concrete when unbonded post-tensioned systems are exposed in the removal process?” TechNotes are a committee document that are narrowly focused, single-topic guides, usually practice oriented, that present a specific direction on a particular issue. ACI committee documents (including TechNotes) are reviewed and approved by ACI’s Technical Activities Committee. Keywords: demolition; hydrodemolition; post-tensioning; repair<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Question Answer Discussion Summary References <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Referenced Standards and Reports <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 364.8T-02 – Tech-Note: Use of Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems (Reapproved 2011)<\/b><\/p>\n |