{"id":222789,"date":"2024-10-19T14:27:58","date_gmt":"2024-10-19T14:27:58","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-21105-12019\/"},"modified":"2024-10-25T08:06:08","modified_gmt":"2024-10-25T08:06:08","slug":"bs-iso-21105-12019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-21105-12019\/","title":{"rendered":"BS ISO 21105-1:2019"},"content":{"rendered":"
This document describes a building enclosure commissioning process to achieve a well performing, durable and maintainable building enclosure. This document includes procedures, methods and documentation requirements describing the application of the commissioning process to a building enclosure at each phase of a project. These project phases span from predesign through owner occupancy and operation. This process is referred to throughout this document as building enclosure commissioning (BECx).<\/p>\n
This document applies to new building construction and building re-commissioning. This document is for use by an owner, commissioning provider, building developer, owner\u2019s representative, construction manager, architect, contractor, and\/or consultant, etc. Its purpose is to determine and complete the required tasks and activities to deliver a building enclosure which meets the performance requirements of the owner. Requirements for the project are established by the owner and\/or commissioning provider (CxP).<\/p>\n
This document identifies steps necessary to perform a building enclosure risk analysis. The analysis will result in tasks that define the level of BECx, commensurate with the owner\u2019s tolerance for risk associated with building enclosure performance.<\/p>\n
The BECx process covered by this document is applicable to an individual assembly, a combination of assemblies or a whole enclosure assembly. For example, an individual assembly can be the fenestration, the air barrier or the thermal insulation. A combination of assemblies would include the fenestration, the air barrier and the complete heat transfer system, (e.g. both the insulation and roof assembly). A whole building enclosure assembly would include all heat, air and moisture control layers of the building enclosure, on all six sides of the building.<\/p>\n
This document describes requirements for any third-party consultants and\/or building enclosure commissioning providers (BECxP) to document their technical qualifications, independence and knowledge of the BECx process, including their education, training, and experience.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and Definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Commissioning process <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5 Risk assessment to determine the level of BECx <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6 Levels of BECx program <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7 Phases of BECx program 7.1 General 7.2 Predesign phase 7.2.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.2.2 Predesign scope of work 7.2.3 BECx project team 7.2.4 Owner\u2019s project requirements – building enclosure <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7.2.5 BECx introductory meeting <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.2.6 BECx budget 7.2.7 BECx tasks <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7.2.8 BECx plan 7.2.9 Basis of design review 7.2.10 BECx progress report 7.3 Design phase 7.3.1 General 7.3.2 Design phase meeting <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.3.3 Level 1 (basic) BECx design review <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.3.4 Level 2 (intermediate) BECx design review <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.3.5 Level 3 (comprehensive) BECx design review <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.3.6 BECx specification 7.3.7 OPR and Cx plan updates 7.4 Construction phase 7.4.1 General <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.4.2 Construction phase documentation requirements 7.4.3 Level 3 (comprehensive) review of bid documents 7.4.4 Construction phase introductory meeting 7.4.5 Checklists 7.4.6 Building enclosure maintenance manual 7.4.7 Construction phase BECx program tasks <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.5 Occupancy phase 7.5.1 General 7.5.2 BE assembly maintenance manual 7.5.3 Facility staff training 7.5.4 Ten-month warranty review 7.5.5 Building enclosure monitoring\/on-going commissioning <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 7.5.6 Building enclosure continuing facility requirements (CFR) 7.5.7 Final (updated) BECx report <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex A (informative) Building enclosure risk factors <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Performance of buildings. Building enclosure thermal performance verification and commissioning – General requirements<\/b><\/p>\n |