{"id":356344,"date":"2024-10-20T01:12:04","date_gmt":"2024-10-20T01:12:04","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-30105-22016\/"},"modified":"2024-10-26T01:34:28","modified_gmt":"2024-10-26T01:34:28","slug":"bs-iso-iec-30105-22016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-30105-22016\/","title":{"rendered":"BS ISO\/IEC 30105-2:2016"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3.1 General 3.2 Structure of the ITES-BPO process assessment model 3.2.1 Relationship to process reference model 3.2.2 Process categories and processes <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.2.3 Process dimension 3.2.4 Capability dimension <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.3 Assessment indicators 3.3.1 Overview <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.3.2 Process capability indicators (PCI) <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3.3.3 Process performance indicators (PPI) 3.4 Measuring process capability <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4 Processes and process performance indicators (level 1) 4.1 General 4.2 Base practices (BPs) and work products (WPs) for ITES-BPO lifecycle processes 4.2.1 Strategic enablement processes <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.2.2 Relationship processes <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.2.3 Solution processes <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.2.4 Transition in processes <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 4.2.5 Service delivery processes <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 4.2.6 Transition out process <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 4.2.7 Tactical enablement processes <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 4.2.8 Operational enablement processes <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 5 Process capability indicators (levels 1 to 5) 5.1 General 5.2 Process capability levels and process attributes <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 5.2.1 Process capability level 0: Incomplete process 5.2.2 Process capability level 1: Performed process 5.2.3 Process capability level 2: Managed process <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 5.2.4 Process capability level 3: Established process <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 5.2.5 Process capability level 4: Predictable process <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 5.2.6 Process capability level 5: Innovating process <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Annex\u00a0A (informative) Conformity of the process assessment model <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | Annex\u00a0B (informative) Work product characteristics <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | Annex\u00a0C (informative) Correlation between ISO\/IEC\u00a020000 and ISO\/IEC\u00a030105 <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Information technology. IT Enabled Services-Business Process Outsourcing (ITES-BPO) lifecycle processes – Process assessment model (PAM)<\/b><\/p>\n |