{"id":369523,"date":"2024-10-20T02:15:18","date_gmt":"2024-10-20T02:15:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/fema-p-2090-2021\/"},"modified":"2024-10-26T03:51:39","modified_gmt":"2024-10-26T03:51:39","slug":"fema-p-2090-2021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/fema\/fema-p-2090-2021\/","title":{"rendered":"FEMA P 2090 2021"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | Executive Summary <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | List of Figures <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | List of Tables <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Introduction 1.1 Congressional Mandate <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 1.2 Approach 1.3 Report Organization and Content <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 1.4 Motivation for Change <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 1.5 Community Resilience <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 1.6 Reoccupancy and Functional Recovery <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 1.6.1 Reoccupancy Defined 1.6.2 Functional Recovery Defined <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 1.6.3 Description of a Target Recovery-Based Performance State <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 1.7 Advancement in Design Capabilities <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 1.8 Costs and Benefits 1.8.1 Costs of Action <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 1.8.2 Benefits of Action <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Framework for Reoccupancy and Functional Recovery RECOMMENDATION 1: Develop a Framework for Post-Earthquake Reoccupancy and Functional Recovery Objectives <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Task 1.1: Develop a Policy for Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Task 1.2: Develop Design Criteria for Achieving Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Task 1.3: Determine Appropriate Hazard Levels for Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Improve the Performance of Buildings <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | RECOMMENDATION 2: Design New Buildings to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Alternative 2-1: Mandate the Design of New Buildings to Meet Recovery-Based Objectives Using Future National Model Code Provisions Alternative 2-2: Mandate the Design of New Buildings to Meet Recovery-Based Objectives Using Interim Provisions Alternative 2-3: Encourage the Voluntary Design of New Buildings to Meet Recovery-Based Objectives RECOMMENDATION 3: Retrofit Existing Buildings to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Alternative 3-1: Mandate the Retrofit of Existing Buildings to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Alternative 3-2: Trigger the Retrofit of Existing Buildings to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Alternative 3-3: Encourage the Voluntary Retrofit of Existing Buildings to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Improve the Performance of Lifeline Infrastructure Systems <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | RECOMMENDATION 4: Design, Upgrade, and Maintain Lifeline Infrastructure Systems to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Task 4.1: Provide National Guidance on Regulatory Authority Across Lifeline Infrastructure Sectors Task 4.2: Evaluate the Ability of Lifeline Infrastructure Systems to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Task 4.3: Develop National Seismic Design Standards to Meet Recovery-Based Objectives for Lifeline Infrastructure Systems <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Task 4.4: Create Regional Lifelines Councils <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Alternative 4-1: Mandate the Design of New and Upgrade of Existing Lifeline Infrastructure Systems to Meet Recovery-Based Objectives Alternative 4-2: Encourage the Voluntary Design of New and Upgrade of Existing Lifeline Infrastructure Systems to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Alternative 4-3: Trigger the Upgrade of Existing Lifeline Infrastructure Systems to Meet Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Expedite Recovery through Pre-Disaster Planning and Implementation <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | RECOMMENDATION 5: Develop and Implement Pre-Disaster Recovery Planning Focused on Recovery-Based Objectives Task 5.1: Develop and Implement Pre-Disaster Recovery Plans <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Task 5.2: Create and Promote Seismic Continuity Programs <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Task 5.3: Expand and Improve Criteria, Guidelines, and Procedures for Post-Earthquake Assessments and Evaluations <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Task 5.4: Plan for Sufficient Staffing to Expedite Post-Earthquake Recovery <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | Task 5.5: Develop and Implement Building Occupancy Resumption Programs <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Task 5.6: Develop Alternative Standards for Temporary Habitability to Facilitate Reoccupancy <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | Enable Action with Education and Financial Resources RECOMMENDATION 6: Provide Education and Outreach to Enhance Awareness and Understanding of Earthquake Risk and Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | Task 6.1: Educate Building and Lifeline Infrastructure System Stakeholders about Earthquake Risk and Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Task 6.2: Educate Design and Construction Industry Professionals about Earthquake Risk and Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | RECOMMENDATION 7: Facilitate Access to Financial Resources Needed to Achieve Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Task 7.1: Develop and Deploy Pre-Disaster Financial Mechanisms to Achieve Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Task 7.2: Develop and Deploy Post-Disaster Financial Mechanisms to Achieve Recovery-Based Objectives <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Assessment and Conclusions 7.1 Qualitative Assessment of Recommendations and Alternatives <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | 7.2 Stakeholder Roles <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 7.3 A Path Forward <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 7.4 Conclusions <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Process and Approach A.1 Committee of Experts <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | A.2 Stakeholder Workshops A.2.1 Workshop Participants <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | A.2.2 Workshop Objectives <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | A.2.3 Workshop Agenda A.2.4 Breakout Session 1: Functional Recovery Framework A.2.5 Breakout Sessions 2 and 3: Assessing and Evaluating Options <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | A.2.6 Workshop Takeaways <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | Supplemental Information on a Framework for Reoccupancy and Functional Recovery B.1 Conceptual Illustration of Recovery Categories <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | B.2 Damage Descriptions for Buildings and Lifeline Infrastructure Systems Meeting Different Target Functional Recovery Times <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | Supplemental Information on Lifeline Infrastructure Systems C.1 Summary of Topics Identified in the NEHRP Lifelines Roadmap <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | C.2 Possible Tasks for a New National Lifelines Organization <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | Supplemental Information on Pre-Disaster Planning and Implementation D.1 Examples of Seismic Continuity Programs <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | D.2 Examples of Assessment and Evaluation Guidelines <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | D.3 Seismic Instrumentation and Other Smart Technologies <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | D.4 Examples of Building Occupancy Resumption Programs and Other Similar Programs <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | References <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" FEMA P-2090: Recommended Options for Improving the Built Environment for Post-Earthquake Reoccupancy and Functional Recovery Time<\/b><\/p>\n |