{"id":431396,"date":"2024-10-20T07:27:59","date_gmt":"2024-10-20T07:27:59","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-213502023-tc\/"},"modified":"2024-10-26T14:11:38","modified_gmt":"2024-10-26T14:11:38","slug":"bs-iso-213502023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-213502023-tc\/","title":{"rendered":"BS ISO 21350:2023 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30473230 <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | A-30453072 <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 4 Requirements 4.1 Responsibilities 4.2 Tailoring 5 Policy 5.1 Evaluation of the OTS item design 5.1.1 General 5.1.2 OTS item requirements 5.1.3 OTS item evaluation <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.2 Rules in a critical application of OTS 5.2.1 Operational boundaries 5.2.2 Design evaluation 5.2.3 OTS item modifications 5.2.4 Qualification requirements <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6 Precautions and warning notes 6.1 Notes about product heritage of OTS item 6.1.1 OTS product heritage 6.1.2 Application of OTS item design\/manufacturing practices 6.1.3 OTS item design margins 6.2 Acquisition of OTS items 6.2.1 General 6.2.2 Specification 6.2.3 Space environment 6.2.4 Configuration control 6.2.5 Acceptance testing <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.2.6 Maintenance 6.3 Management of modified OTS item 6.3.1 Purchasing 6.3.2 Qualification 6.4 Programmatic decision to use an OTS item 6.4.1 Functional\/technical capability 6.4.2 Interface definition 6.4.3 Modification versus heritage 7 Decision logic for OTS item usage <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 8 Procedure 8.1 Categorizing of available OTS items 8.2 Considering a good candidate for selection 8.3 Compromise of discrepancies between an OTS item and project requirements 8.4 Satisfying the OTS item\u2019s requirements 8.4.1 Qualification plan 8.4.2 Categorization <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 8.4.3 Combining the parameters <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex A (informative) A decision logic for OTS item utilization <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex B (normative) Requirement list for OTS item utilization <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex C (informative) OTS item application categories <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Space systems. Off-the-shelf item utilization<\/b><\/p>\n |