{"id":451863,"date":"2024-10-20T09:20:50","date_gmt":"2024-10-20T09:20:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16603-202023-tc\/"},"modified":"2024-10-26T17:24:47","modified_gmt":"2024-10-26T17:24:47","slug":"bs-en-16603-202023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16603-202023-tc\/","title":{"rendered":"BS EN 16603-20:2023 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
124<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | 3 Terms, definitions and abbreviated terms 3.1 Terms from other standards 3.2 Terms specific to the present standard <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | 3.3 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | 3.4 Nomenclature <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | 4 General requirements 4.1 Interface requirements 4.1.1 Overview 4.1.2 Signals interfaces 4.1.3 Commands <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | 4.1.4 Telemetry 4.2 Design 4.2.1 Failure containment and redundancy 4.2.1.1 General requirements <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | 4.2.1.2 Reliable insulation <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | 4.2.2 Data processing 4.2.2.1 Overview <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | 4.2.2.2 Provisions <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | 4.2.3 Electrical connectors <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | 4.2.4 Testing <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | 4.2.5 Mechanical: Wired electrical connections 4.2.6 Miscellaneous <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | 4.3 Verification 4.3.1 Provisions 4.3.2 Documentation <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | 5 Electrical power 5.1 Functional description 5.2 Power subsystem and budgets 5.2.1 General 5.2.2 Provisions 5.2.2.1 Power subsystem 5.2.2.2 Engineering process <\/td>\n<\/tr>\n | ||||||
161<\/td>\n | 5.3 Failure containment and redundancy <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | 5.4 Electrical power interfaces <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | 5.5 Power generation 5.5.1 Solar cell, coverglass, SCA and PVA qualification 5.5.2 Solar array specification and design <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | 5.5.3 Solar array power computation <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | 5.5.4 Solar array drive mechanisms 5.6 Electrochemical Energy Storage 5.6.1 Applicability <\/td>\n<\/tr>\n | ||||||
169<\/td>\n | 5.6.2 Batteries <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | 5.6.3 Battery cell 5.6.4 Battery use and storage <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | 5.6.5 Battery safety 5.6.5.1 Overview 5.6.5.2 Provisions <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | 5.7 Power conditioning and control 5.7.1 Applicability 5.7.2 Spacecraft bus <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | 5.7.3 Battery Charge and Discharge Management 5.7.4 Bus under-voltage or over-voltage <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | 5.7.5 Power converters and regulators <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | 5.7.6 Payload interaction <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | 5.8 Power distribution and protection 5.8.1 General <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | 5.8.2 Harness <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | 5.9 Safety 5.10 High voltage engineering <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | 5.11 Verification 5.11.1 Provisions 5.11.2 <> <\/td>\n<\/tr>\n | ||||||
186<\/td>\n | 6 Electromagnetic compatibility (EMC) 6.1 Overview 6.2 Policy 6.2.1 Overall EMC programme 6.2.2 EMC control plan <\/td>\n<\/tr>\n | ||||||
187<\/td>\n | 6.2.3 Electromagnetic compatibility advisory board (EMCAB) 6.3 System level 6.3.1 Electromagnetic interference safety margin (EMISM) 6.3.1.1 Circuits categories <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | 6.3.1.2 Critical points 6.3.1.3 Margins 6.3.2 Inter-element EMC and EMC with environment 6.3.2.1 Overview 6.3.2.2 EMC with the launch system 6.3.2.3 Protected frequency bands 6.3.2.4 Lightning 6.3.3 Hazards of electromagnetic radiation <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | 6.3.4 Spacecraft charging protection program 6.3.4.1 Applicability 6.3.4.2 General 6.3.4.3 Performance <\/td>\n<\/tr>\n | ||||||
190<\/td>\n | 6.3.5 Intrasystem EMC 6.3.6 Radio frequency compatibility 6.3.7 Spacecraft DC magnetic field emission 6.3.7.1 Overview 6.3.7.2 Spacecraft with susceptible payload <\/td>\n<\/tr>\n | ||||||
191<\/td>\n | 6.3.7.3 Attitude control subsystem 6.3.8 Design provisions for EMC control 6.3.8.1 Electrical bonding 6.3.8.2 Grounding 6.3.8.3 Wiring 6.3.9 Detailed design requirements 6.4 Verification 6.4.1 Verification plan and report <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | 6.4.2 Safety margin demonstration for critical or EED circuit 6.4.3 Detailed verification requirements <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | 7 Radio frequency systems 7.1 Functional description <\/td>\n<\/tr>\n | ||||||
194<\/td>\n | 7.2 Antennas 7.2.1 General 7.2.1.1 Overview 7.2.1.2 Provisions 7.2.1.3 Failure containment and redundancy <\/td>\n<\/tr>\n | ||||||
195<\/td>\n | 7.2.2 Antenna structure 7.2.2.1 General 7.2.2.2 Categories <\/td>\n<\/tr>\n | ||||||
196<\/td>\n | 7.2.2.3 Elements <\/td>\n<\/tr>\n | ||||||
199<\/td>\n | 7.2.2.4 Technologies <\/td>\n<\/tr>\n | ||||||
200<\/td>\n | 7.2.2.5 Performance parameters 7.2.3 Antenna interfaces 7.2.3.1 Guided-wave interfaces <\/td>\n<\/tr>\n | ||||||
201<\/td>\n | 7.2.3.2 Radiative interfaces 7.2.4 Antennas Verification 7.3 RF Power 7.3.1 Overview <\/td>\n<\/tr>\n | ||||||
202<\/td>\n | 7.3.2 RF Power handling (thermal) 7.3.2.1 General requirements 7.3.2.2 Design and Verification 7.3.3 Corona or Gas Discharge 7.3.3.1 General requirements 7.3.3.2 Design and Verification <\/td>\n<\/tr>\n | ||||||
203<\/td>\n | 7.3.4 Qualification for power handling and gas discharge 7.4 Passive intermodulation 7.4.1 Overview 7.4.2 General requirements 7.4.3 Identification of potentially critical intermodulation products <\/td>\n<\/tr>\n | ||||||
204<\/td>\n | 7.4.4 Verification 7.4.5 Qualification for passive intermodulation 7.5 Verification <\/td>\n<\/tr>\n | ||||||
205<\/td>\n | 8 Pre-tailoring matrix per space product and feature types 8.1 Introduction <\/td>\n<\/tr>\n | ||||||
206<\/td>\n | 8.2 Use of the inclusive and exclusive requirement categories <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Space engineering. Electrical and electronic<\/b><\/p>\n |