{"id":457240,"date":"2024-10-20T09:50:15","date_gmt":"2024-10-20T09:50:15","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-933-2013\/"},"modified":"2024-10-26T18:17:02","modified_gmt":"2024-10-26T18:17:02","slug":"ieee-933-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-933-2013\/","title":{"rendered":"IEEE 933-2013"},"content":{"rendered":"
Revision Standard – Active. Guidelines for the definition of a reliability program at nuclear generating stations and other nuclear facilities are provided. The document emphasizes reliability programs during the operating phase of such stations; however, the general approach applies to all phases of the nuclear power generating station life cycle (e.g., design, construction, start-up, operating, and decommissioning).<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 933-2013 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page \n <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents \n <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Important Notice \n 1. Overview <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.1 Scope 1.2 Purpose 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.2 Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4. Program elements 4.1 Performance monitoring <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.2 Performance evaluation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.3 Problem prioritization <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 4.4 Problem analysis and corrective action recommendation <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 4.5 Corrective action implementation and feedback <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5. Major programmatic resources <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.1 Operations <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.2 Maintenance 5.3 Engineering <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.4 Safety <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.5 Licensing 5.6 Quality assurance 5.7 Procurement <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex A (informative) Reliability program management A.1 Planning <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | A.2 Integration A.3 Organization <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | A.4 Controlling A.5 Leadership <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Annex B (informative) Case study\u2014Application of Excelsior Power Company\u2019s reliability program plan to service water pumps B.1 Overview B.2 Service water pump performance <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex C (informative) Sample RAM specification for replacement service water pumps <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | C.1 Section 1: General C.2 Section 2: Scope C.3 Section 3: Specific RAM requirements <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | C.4 Section 4: RAM tasks <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | C.5 Section 5: Availability demonstration <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | C.6 Section 6: Root cause analysis <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Annex D (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Definition of Reliability Program Plans for Nuclear Generating Stations and Other Nuclear Facilities<\/b><\/p>\n |