{"id":457321,"date":"2024-10-20T09:50:35","date_gmt":"2024-10-20T09:50:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-2783-2023-3\/"},"modified":"2024-10-26T18:17:32","modified_gmt":"2024-10-26T18:17:32","slug":"ieee-2783-2023-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-2783-2023-3\/","title":{"rendered":"IEEE 2783-2023"},"content":{"rendered":"
New IEEE Standard – Active. This guide documents quick response load control, system implementation, test and commissioning for the quick response system of customer-side loads. It is intended to cover the quick response system applications of customer-side loads for centralized frequency control in modern power systems.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 2783\u2122-2023 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.\u2002Structure of the guide <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.\u2002Quick response load control 5.1\u2002Overview <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.2\u2002Quick response loads <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3\u2002Emergency frequency control <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.\u2002Typical architecture and composition of quick response systems of customer-side loads 6.1\u2002Typical architecture of quick response systems of customer-side loads 6.2\u2002Key components of quick response systems of customer-side loads <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.3\u2002Communication and network 6.4\u2002Other technical requirements <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.\u2002Test and commissioning 7.1\u2002Overview <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.2\u2002Unit test <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.3\u2002Sub-system test <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.4\u2002System test <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7.5\u2002Signal test mode and system test operation <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex\u00a0A (informative) Project case:\u200bJiangsu emergency load control system A.1\u2002Background A.2\u2002Architecture <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | A.3\u2002Strategy and criteria <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex\u00a0B (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Application of Quick Response Systems of Customer-Side Loads in Modern Power Grids (Published)<\/b><\/p>\n |