{"id":79043,"date":"2024-10-17T18:28:24","date_gmt":"2024-10-17T18:28:24","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784409497-2008\/"},"modified":"2024-10-24T19:38:55","modified_gmt":"2024-10-24T19:38:55","slug":"asce-9780784409497-2008","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784409497-2008\/","title":{"rendered":"ASCE 9780784409497 2008"},"content":{"rendered":"
Tim Davis assembles in-depth field manual for soil technicians and geotechnical engineers for use during the investigation, grading, and construction phases of geotechnical projects.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Acknowledgments <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Chapter 1 The Classification of Soil The Unified Soil Classification System <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Care in Classification Distinguishing Soil Types <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Descriptive Classification Terminology <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Chapter 2 Exploration Techniques and Sampling Methods Backhoe Trenches <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Rock Excavation Study (Rippability) <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Split Barrel Sampling <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Sampling with Rings <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Thin-Walled Tube Sampling <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Chapter 3 Basic Laboratory Tests Modified Proctor (ASTM D1557) <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Sieve Analysis (ASTM D422) <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Hydrometer Analysis (ASTM D422) <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Plastic and Liquid Limits Test (ASTM D4318) <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Chapter 4 Field Density Tests <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Sand Cone Test (ASTM D1556) <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Nuclear Gauge\u2014Moisture\/Density Test (ASTM D6938) <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | Chapter 5 Soil Engineering for the Technician Project Preparation <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Flatland Projects Road Construction <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | Hillside Grading <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Deep Foundations Shallow Foundations <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Retaining Walls <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | The Technician\u2019s Steps to Success <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Chapter 6 Geology for the Technician Recognizing Geologic Conditions <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | Chapter 7 Project Management for the Technician Project Preparation <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Contractors\u2019 \u201cTop 10 Reasons\u201d\u009d Why Their Fill Is Okay Observation, Communication, Testing, and Documentation <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | Chapter 8 Loss Prevention Example Case History <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | Proper Word Choices for Daily Field Report Writing <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | Chapter 9 Safety in the Field Trench Safety <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | Grading Project Safety <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | Chapter 10 Putting it All Together: An Example Project Scenario Site Investigation <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | Office Pre-job Meeting <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | Project Preparation <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | On-site Pre-grade Meeting Construction: Testing and Observation <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | Communication\u2014With the Contractor and Your Office Documentation\u2014The Paper Trail <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | Example Geotechnical Report <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | Chapter Questions <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | Chapter 11 A Technician\u2019s Quick Reference The Right Choice of Compaction Equipment <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | Basic Checklist of a Technician\u2019s Supplies and Tools <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | Measures, Formulas, and Conversions <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | Appendix A: Glossary of Geotechnical-Related Terms A <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | B <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | C <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | D <\/td>\n<\/tr>\n | ||||||
169<\/td>\n | E <\/td>\n<\/tr>\n | ||||||
170<\/td>\n | F <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | G <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | H <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | I J K <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | L <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | M <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | N <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | O <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | P <\/td>\n<\/tr>\n | ||||||
182<\/td>\n | Q R <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | S <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | T <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | U V <\/td>\n<\/tr>\n | ||||||
190<\/td>\n | W Y Z <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | Appendix B: Answer Keys <\/td>\n<\/tr>\n | ||||||
202<\/td>\n | Appendix C: Sample Field Forms and Details <\/td>\n<\/tr>\n | ||||||
222<\/td>\n | Afterword <\/td>\n<\/tr>\n | ||||||
224<\/td>\n | Index A B C D <\/td>\n<\/tr>\n | ||||||
225<\/td>\n | E F G H L M N O P <\/td>\n<\/tr>\n | ||||||
226<\/td>\n | R S T <\/td>\n<\/tr>\n | ||||||
227<\/td>\n | U W <\/td>\n<\/tr>\n | ||||||
228<\/td>\n | About the Author <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Geotechnical Testing, Observation, and Documentation<\/b><\/p>\n |